Dissertation > Excellent graduate degree dissertation topics show

Weifang·Bailang River Underground Project Risk Management Research

Author: ZhouRuiHua
Tutor: WangYuanYue;ZuoLei
School: Ocean University of China
Course: Project Management
Keywords: Underground works Risk Risk identification and assessment Analytic Hierarchy Process
CLC: F426.92
Type: Master's thesis
Year: 2009
Downloads: 138
Quote: 0
Read: Download Dissertation

Abstract


With the increasing development of urban high-rise buildings and underground engineering , the size and complexity of the underground projects increasing , showing a long cycle , large investment and internal structure , external linkages widely affect the large success of the project . Underground engineering based on the complexity of the implementation process , there are a lot of uncertainties , each of the uncertainty factors will have an impact on the project , resulting in a larger project risk . In order to ensure the smooth implementation of the project of construction of underground works in advance of its risk objective , reasonable identification, analysis and evaluation , and it is absolutely necessary to take appropriate measures . This paper first analyzes the characteristics of risk management concepts and features, as well as the underground project risk and risk management . Secondly, the the underground engineering risk management process - risk identification , risk estimation and analysis , risk response and monitoring were in-depth discussions . Attempt to systematize the process of risk management procedures and institutionalized . Risk identification is the basis of risk management ; risk estimation and evaluation are key to risk management ; risk management decision-making is the core of risk management . Several stages of the risk management risk management dynamic closed-loop system . With the implementation of the risk management program , risk there will be many changes , and these changes should be timely feedback , risk managers timely analysis of the new situation , so as to adjust the risk response plan , and so on ad infinitum , to maintain the dynamic of the risk management sex in order to achieve the intended purpose of risk management . Finally , the paper focuses on two methods of decomposition analysis and analytic hierarchy process . Try underground engineering risk management region in Weifang , risk identification through decomposition analysis method , analysis method assessment project risk level for the whole process of design and construction , and discusses the effect of these measures , indicating that the reality of the underground project risk management significance. The underground engineering project risk assessment is a very complex system problems , underground project risk management in theory a little of their own insights , provides an analytical and problem-solving ideas and framework for further engaged in underground engineering the work of building a risk management has played a guiding role .

Related Dissertations

  1. Research and Analysis of Postcholecystectomy Diarrhoea (PCD) in Chronic Calculous Cholecystitis,R657.4
  2. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  3. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  4. Financing Behaviors of Sina Microblogging in View of Risks,F49
  5. Research on Index System and Evaluation of University Office Greening,G647
  6. The Study on Risk Evaluation of BOT Projects in China University,G647
  7. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  8. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  9. Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
  10. Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
  11. Assessment of Resistance Risk in Spodoptera Exigua (Hubner) and Spodoptera Litura (Lepidoptera: Noctuidae) to Chlorantraniliprole,S433
  12. Study on the Management Strategy of University’s Brand,G647
  13. A Smoothing Method for Solving Model under WCVarR,O224
  14. The Empirical Research of the Important Factors of the Financial Risks of Chinese A-share Construction Enterprises Market,F426.92
  15. Monitoring of Insecticide Resistance, Resistance Risk Assessment and Biochemical Mechanism for Buprofezin in Nilaparvata Lugens(St(?)l),S435.112.3
  16. Insceticide Screening and Resistance Risk Assessment for Thiamethoxam in Western Flower Thrips, Frankliniella Occidentalis,S433
  17. Bioactivities of Shenqinmycin Against Xanthomonas Oryzae PV. Oryzae and Sclerotinia Sclerotiorum and the Resistance Risk,S435.111
  18. Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
  19. A Comprehensive Evaluation of Heritage Trees,S788
  20. The Research of Credit Construction in the Problem of National Student Loan,G647.5
  21. Environmental Lead Exposure Among Preschool Children in Hefei, China: Blood Lead Level and Risk Factors,R179

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile