Dissertation > Excellent graduate degree dissertation topics show

BOT Project Financing Risk Evaluation Study

Author: LiDong
Tutor: LiTao
School: Tianjin University of Commerce
Course: Technology Economics and Management
Keywords: BOT financing model risk AHP evaluation index system
CLC: F283
Type: Master's thesis
Year: 2008
Downloads: 517
Quote: 4
Read: Download Dissertation

Abstract


This paper summarizes the project finance theory and the situation of the research of BOT project financing,introduces the model of project financing,and also explains the operational procedures of the representative model BOT which includes:setting up a project,calling for a bid,pre-qualification,evaluation and decision of the bid,negotiations and approval,transfer and operation.This paper describes the possible risk in BOT project financing process,introduces the concept of risk and risk assessment,and then further analysis the BOT project financing risk characteristics.At the same time the risk of financing are classified by the two methods:Stage (construction phase,the operational phase,completion stage) and Controllability(political, economic,force majeure,operating maintenance,environmental risks).According to the identifiability principle,commeasurable principle and practicable principle of evaluation exercise of the project scenario,this paper designs BOT project financing risk index system.This paper also proposes the appraisal method,just as degree evaluate method in political risk evaluation,5C characteristic analysis in credit risk evaluation,according to the detailed index in risk evaluation. It also introduces the quantitative analysis method in project financing,as AHP,fussy analysis method and sensitive analysis.Finally,this paper carries on the appraisal using the quantitative analysis method to the Guiyang creek Sewage treatment plant financing risk.The methods used in this article contain:the literature methodology,the analytic hierarchy process and the fuzzy comprehensive analytic method.The innovation point lies in using the analytic hierarchy process & the fuzzy synthesis analytic method to carry on the risk analysis and using the financial norm to carry on the efficient analysis,supplemented mutually,further enhancing the project financing risk analysis reliability.

Related Dissertations

  1. Research and Analysis of Postcholecystectomy Diarrhoea (PCD) in Chronic Calculous Cholecystitis,R657.4
  2. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  3. Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
  4. The Studies and Establishment of Ready-mixed Concrete Information-guided Price on the Basis of Risk Analysis,F407.92
  5. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  6. Financing Behaviors of Sina Microblogging in View of Risks,F49
  7. Research on Index System and Evaluation of University Office Greening,G647
  8. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  9. Highland lakes Lakes sustainable development assessment system and model,X22
  10. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  11. Evaluation Index System Structure of University Students’ Choreographing Capability of Physical Education Aerobics Majors,G831.3
  12. Study on Evaluation Index System for Land Ecological Security,X826
  13. Research on Index System of Marketing Risks in Apparel Enterprises,F426.86
  14. Study on the Management Strategy of University’s Brand,G647
  15. Study on Fuel Supply of Henan Straw Power Generation,TM619
  16. In Jiangsu Province a Dominance Evaluation of Cropping Pattern Bassed on the Comparative Advantage Theory,S344
  17. On the Risk Model Involving Two Classes of Claims with Threshold Dividend Strategy,O211.67
  18. Risk Assessment & Spatial Distribution of Soil Nutrients and Heavy Metal in Fenhe Reservoir Surrounding,S158
  19. Percutaneous Transhepatic Gallbladder Drainage for Treatment of Acute Cholecystitis in High-risk Clinical Analysis and Follow-up,R657.4
  20. Analysis of the Risk Factors Influencing the Morbidity and the Prognosis of Hepatic Encephalopathy,R747.9
  21. Risk Factors for the Development of Transient Hypotony after Sinlicone Oil Removal in Aphakia Eyes,R779.6

CLC: > Economic > Economic planning and management > Infrastructure the economy > Infrastructure investment and economic benefits
© 2012 www.DissertationTopic.Net  Mobile