Dissertation > Excellent graduate degree dissertation topics show
High-speed railway steel truss girder cable-stayed bridge construction process simulation analysis and feasibility study for construction of the tower beam synchronization
Author: WuXiaoWu
Tutor: HeXuHui
School: Central South University
Course: Civil Engineering
Keywords: high speed railway long-span cable-stayed bridge simulation analysis construction control minimum bending energy method reasonable completed bridge state comparison of construction programme of Pylon and beam synchronous Construction
CLC: U448.27
Type: Master's thesis
Year: 2011
Downloads: 86
Quote: 1
Read: Download Dissertation
Abstract
|
In recent years, with the use of high strength materials, improvements of structural analysis methods and the progress in construction, long span railway bridge has been in the rapid development and wide application, its construction and control of the process is extremely complex,and it receives academic widespread concern in industry and engineering, but it brings many new issues to control of cable-stayed bridge construction, the simulation calculations of the control of cable-stayed bridge construction process is the bridge’s main means to determine static state of cable-stayed bridge; it’s also one of the main construction control for cable-stayed bridge. The main work is as follows:1、Through extensive reading of available information and organize, it discusses the development,trends and performance characteristics of long span cable-stayed railway bridge, and it describes the main content of construction control and simulation analysis method;2、Based on double Yujiang Railway Bridge, it describes two different construction programs, and the characteristics and differences between the two is discussed;3、Determining the reasonable status of cable-stayed bridge is key to simulation analysis construction control; In this paper,the method of minimum bending energy method and forward analysis is applied to determine the state of bridge, then the construction phase is under analysis and calculation;it gets the main beam of the internal force, displacement, stress, shift the main tower and the cables of the internal force and stress under various stages;4、It selects a representative to study the construction phase. The results of simulation is analysized in detail, some of the changes in the construction process of cable-stayed bridge are summarized,and it supplies implementation of a theoretical basis in the construction control; At the end, the construction of the tower beam synchronization program and cantilever construction program are compared in detail, and the feasibility of changing the program is demonstrated.
|
Related Dissertations
- Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
- Study on the Subsurface Crack of Supporting Roller Made of Austempered Ductile Iron,TG156.3
- Monitioring of Mechanics Properties of Geogrid-Reinforced and Pile-Supported Embankment in Chaoshan Station,TU470
- Quanhe Bridge Construction Monitoring & Control,U445.1
- The Kinematics/Elasticity Kinematics Analysis and Optimization of Multi-link Suspension System,U463.33
- Research on a Water-lubricated Radial Journal Bearing Test-Bed,TH133.31
- Studies on Railway Bridge Coupled Vibration of Train Rail-Bridge System Under the Influence of Creep,U441.3
- A project supervision model of multi-project management company,F284
- Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
- Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
- The Construction Control for PC Continuous Beam Bridge,U445.4
- Single Tower Cable-stayed Single Cable Plane Design, Construction and Construction Control Technology,U448.27
- Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
- Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
- Study on Concrete Creep Theory Applied in Construction of Continuous Rigid Frame Bridge,U445.57
- Research on Prestressed Concrete Continuous Rigid-frame Bridge Construction Control and Fold Technology,U445.4
- The Design and Construction Technology of a Steel-concrete Composite Bridge in the Interchange Crossing ZhengShi Highway,U445
- The Construction Control Research on the Long-span Continuous Rigid Frame Bridge,U445.4
- Cantilever Casting Construction Technology of Yanghe Bridge,U445.466
- Construction Stress Analysis and Control of Long-span Arch Bridge,U448.22
- Truss Arch Bridge Construction Control Technology,U445.4
CLC: > Transportation > Road transport > Bridges and Culverts > All kinds of bridges > Bridge: Structure > Cable-stayed bridge
© 2012 www.DissertationTopic.Net Mobile
|