Dissertation > Excellent graduate degree dissertation topics show

Study on Application of Total Station in Highway Tunnel Deformation Measurement

Author: ZuoWeiZheng
Tutor: ChenJianXun
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: Tunnel project Total Station Non-contact measurement MLM On-site monitoring Accuracy analysis
CLC: U456.3
Type: Master's thesis
Year: 2011
Downloads: 125
Quote: 1
Read: Download Dissertation

Abstract


Deformation monitoring is an important means to monitor the stability of the surrounding rock and supporting structure, to ensure construction safety, reasonable assurance as an important and indispensable support parameters, is the connection point and a necessary part of the design and construction. Traditional contact measurement surrounding rock deformation has been unable to meet the requirements of tunnel construction. Total station measurements tunnel surrounding rock deformation has been applied, the total station measurements and compared to traditional measurement methods, accuracy has not been a very good answer, affected the promotion of of total station non-contact measurement. To evaluate the accuracy of the total station non-contact measurement method and measurement accuracy, the to the pier beam tunnel and Yuanjiazao acupuncture tunnel as engineering relying on computational analysis by field comparison test and accuracy are two methods, the measurement of total station conducted a comprehensive analysis accuracy. The main contents and results are as follows: (1) the pier beam Tunnel relying Vault Sink contrast measurement field test, measurement methods, including the Level-contact measurement, the total station on the edge measurement and three-dimensional coordinates of the non-contact measurement; Yuans acupuncture tunnel relying convergence measurement of contrast-site test, measurement methods including Convergence meter-contact measurement, Total Station edge measurement and three-dimensional coordinates of non-contact measurement. (2) Monitoring results show that: the total station measurements tunnel surrounding rock deformation monitoring to the value of the core soil before excavation contact measurement monitoring less than the surrounding rock deformation. The core soil before excavation, vault sinking value of 19.7mm, accounting for 17.7% of the sinking value of the construction phase of value of clearance convergence is 11.1mm, accounting for 28.8% of the value of the construction phase of convergence; core soil excavation, on the edge measurement non-contact measurement and water level monitoring results, the average deviation is 1.9mm, accounting for 1.7% of the value of the sinking of the construction phase, the edge average deviation value measurement non-contact measurement and convergence gauge monitoring results 0.83mm, convergence value of the share of the construction phase. 2.3 percent;-to-edge measurement is higher than the three-dimensional coordinate measurement accuracy. (3) application of the law of error propagation calculation and analysis of Total Station-to-edge measurements in tunnel construction engineering precision applications. The analysis results show that: When the The Total Station accuracy of MS = 2ppm, ma = 1 \Shen value of monitoring accuracy can reach 0.43 0.68mm convergence value of monitoring accuracy can reach 0.47 ~ 0.69 mm (4) through different precision total station monitoring the tunnel surrounding rock deformation calculation shows that: When the total station accuracy or higher than ms = 2ppm, ma = 2 \Computational analysis, contrast and precision through the on-site monitoring data show that the total station the edge measurement monitoring accuracy within the allowable range, the location of the station is more flexible, improve work efficiency, and construction parallel job monitoring to good effect.

Related Dissertations

  1. Research on the Optimization of Laser Triangulation Device,TH744.5
  2. Axial fan blade vibration non-contact measurement,TD441.2
  3. STM32 based on linear CCD and accurate measurement of the diameter of the needle research,TH133.333
  4. Research on Optimization Problems in Guidance System for Shield Tunneling,U455.43
  5. Research on Key Technologies of Three-dimensional Surface Roughness Measurement,TG84
  6. Research on Automatic Sea-Crossing Trigonometric Leveling Based on Intelligent Total Station,P224.2
  7. College Students' Participation in MLM activities prevention countermeasures,G641
  8. Non-Contact Dynamic Measurement of the Yarn Tension in Winding Process,TP274.4
  9. Design of On-Line Measuring System for Running State of High-Speed Train Wheel,U216.3
  10. The Design and Implementation of Off-Site Supervision System in Bank,TP274.4
  11. College Students’ Pyramid Selling and Ideological Education of "four Outlooks",G641
  12. Study on the Methods of Assessing Precision of the GAT Gyro Total Station,P228.4
  13. On the organization, leadership pyramid schemes main crime problems,D924.3
  14. Study on the Organizing and Leading Multi-level Marketing Crime,D924.3
  15. Wuhan-Guangzhou passenger line karst roadbed reinforcement and reinforcement effect rapid assessment study,U213.157
  16. Study on the Crime of Organizing and Leading Pyramid Schemes,D924.3
  17. Tree height measurement integrated technical comparative study,S758
  18. Study on the Crime of Leading and Organizing the Pyramid Selling,D924.3
  19. Crime of Organization and Leadership of Pyramid Sales,D924.3
  20. Analysis of Dynamic Response of Surface Building under the Condition of Blasting Excavation of Urban Tunnel,U455.6

CLC: > Transportation > Road transport > Tunnel project > Tunnel observations and experimental > Tunnel construction and use of monitoring