Dissertation > Excellent graduate degree dissertation topics show
Concrete-filled Steel Tubular Basket-handling Arch Bridge Vertical Swivel Construction Control Simulation Analysis
Author: YangXingTao
Tutor: ZuoXiaoGuang
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: Basket handle arch bridge Simulation Analysis Rib - hoisting Construction Monitoring
CLC: U445.465
Type: Master's thesis
Year: 2011
Downloads: 31
Quote: 0
Read: Download Dissertation
Abstract
|
Large Span CFST Arch Bridge Rib the hoisting process is a complex process , and To guarantee the final bridge linear and force the state to meet the design requirements , construction control simulation . This paper Hebei Hutuohe steel pipe arch bridge engineering background , from introductory Concrete Filled Steel Tubular exhibition overview , structural features and research status . Bridge construction process simulation analysis . The main content of this paper is as follows : (1) are described in detail the steel basket handle arch bridge construction control principles, methods , as well as factors affecting the construction control . (2 ) established according to the actual construction of the space finite element model of the construction process simulation CFST arch bridge construction process simulation analysis , analysis force performance in the construction process , the the forecast construction process in the development of stress and deformation , and give actual construction control to provide the basis for theoretical guidance . ( 3 ) In order to ensure that the final bridge linear and force the state to meet the design requirements , the Hutuo River Bridge to establish a real-time monitoring system . Through this CFST arch bridge throughout the construction process simulation analysis , the calculation results and on-site monitoring data were analyzed and compared to its theoretical value and the measured results are in good agreement . This indicates that the finite element analysis method used to better reflect the actual construction . Construction Control Simulation analysis can play a better role in guiding Hutuohe Bridge Construction monitoring .
|
Related Dissertations
- Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
- Injection Process Analysis and Optimized Deign of MP4 Product Based on the Moldflow Software,TQ320.662
- 1200 tons automatic autoclaved fly ash brick molding equipment research and design of hydraulic systems,X705
- The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
- Study on the Subsurface Crack of Supporting Roller Made of Austempered Ductile Iron,TG156.3
- The Research on the Transmission Performance of SCTP Over Multiple Paths,TN915.04
- Multisim Simulation Software in Electronic Technology Practical Teaching Application,TN0-4
- One kind of peer to peer network file sharing algorithm simulation and performance analysis and comparison,TP393.09
- Automated welding boiler membrane wall design and research,TG409
- Based on the deck of the lifting platform telescopic cylinders electro-hydraulic control system studies,TH137
- FOG inclinometer thermal simulation analysis and optimization,V241.5
- Concrete pumping system hydraulic shock and stroke deviation Optimization,TU646
- Regional grid operation Evaluation Index System and Evaluation Method,TM732
- TBM cutterhead system synchronization driven research,TM921.48
- Research on Energy-Efficient Strategies of Underwater Wireless Sensor Networks,TP212.9
- Pre-shift Control and Simulation of Dual-clutch Automatic Transmission,U463.212
- Large-span steel box basket handle arch bridge dynamic characteristics of the high-speed rail and earthquake response analysis,U442.55
- High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
- The Construction Control for PC Continuous Beam Bridge,U445.4
- Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology > Erection method > Rotation erection
© 2012 www.DissertationTopic.Net Mobile
|