Dissertation > Excellent graduate degree dissertation topics show

Improvement and Implementation of Lean Production Management System in Multi-varieties and Small-batch

Author: WangSiBao
Tutor: WangShiLong
School: Chongqing University
Course: Mechanical Manufacturing and Automation
Keywords: Many varieties of small batch Lean Production Production management System implementation
CLC: TH186
Type: Master's thesis
Year: 2011
Downloads: 197
Quote: 0
Read: Download Dissertation

Abstract


This paper analyzes the original production of the XX company management methods and production management system features , lean production management improved model for the existing problems and lean production management system improvements , and finally propose a complete system implementation plan and post- maintenance methods to ensure the smooth implementation and operation of the system in the company . The main tasks of the papers are as follows : ① analysis of the company 's original production management methods and the original production management system , for which the existence of the problem , the use of lean production management methods to improve the original production management , and the original production management the system has been improved , improved model of the system management of the various plans to establish a production management system . ( 2 ) for the lack of original production management system to increase the materials planning management and borrow pieces of program management , improvement of the original master production schedule management and basic data management . Materials program management Knowledge Base machine plus stage blank stage monitoring time node sequence control , material plan closely co-ordinated with the master plan , so that the material plan and the master plan is no longer a separate plan to improve the production planning continuity in the level of parts and processes ; simply by the increase in the underlying data material code borrowed pieces of identification code , to borrow pieces plan adjustments , so borrow pieces do not need to program management in various products the main products to monitor and improve the efficiency of the implementation of the system . ③ develop a detailed lean manufacturing implementation essentials , lean production management system documentation and system implementation plan , including the implementation of plans to clear planning of each stage in the process of implementation of the system . Lean manufacturing implementation essentials with lean production management system documentation for system implementation guidance documents , in accordance with the implementation plan to promote the smooth implementation of lean production management system . The system XX Industrial Co., Ltd. has been put into trial operation , the production units , said that the plan formulated by the system is accurate , perfect , linked closely with the actual production , and has continued to improve production planning functions , and to achieve data sharing of existing infrastructure , transparency of information , and reduce the number of production workshop inventory , to achieve the desired effect .

Related Dissertations

  1. Research on the Make-up Pen Production Flow Improvement of Chromalyra(tianjin)co.,ltd.,F273
  2. F enterprises with RFID data capture products to improve i Research and Application,TP274.2
  3. Study of the Application of Kanban System in Andrew Stihl Power Tools (Qingdao) Co., Ltd.,F273
  4. Mechanical Manufacturing Enterprise Production Planning System Optimization Design-take NBZC for Example,F426.4
  5. Study on Manufacturing Execution System in Multi-varieties and Small-batch Environment and Its Application,TP311.52
  6. A Case Study of ERP System Implementation for A Foreign Trade Company,F752
  7. The Research and Development of Purchase-Sale-Stock Management System for Foundry Enterprises,TP311.52
  8. Research on Learning-Based Super-Resolution and SR System Implementation,TP391.41
  9. HL company production lead Issues,F426.6
  10. FiberHome SRM system implementation study,F626
  11. Lean body shop in Dongfeng Honda Application,F426.471
  12. Lean shipbuilding parts lane cutting and palletized applied research,F426.474
  13. ACCC conductor transmission line based Rehabilitation Study,TM755
  14. Third-party logistics company warehouse sorting and distribution of lean management,F259.23
  15. Supplier Quality Management,F273.2
  16. Based on the theory of shock absorber production TOC analysis and improvement,TB535.1
  17. H 's \,F426.4
  18. Research on Modeling and Simulation of Sea Clutter and Implementation on FPGA,TN955
  19. Improvement on Production Processes of Display and Control Panels,V268.7
  20. Research on Improvement of Case Production Line Base on Value Stream Mapping,TH186

CLC: > Industrial Technology > Machinery and Instrument Industry > Machine shop (workshop ) > Production and technology management