Dissertation > Excellent graduate degree dissertation topics show
Research on at Traction Suck Current Rate to Improve the Accuracy of the Fault Location
Author: YangZuoChun
Tutor: ChenXiaoChuan
School: Southwest Jiaotong University
Course: Proceedings of the
Keywords: High-speed rail All Parallel AT Power Supply Fault Location Suction on the current ratio
CLC: TM922
Type: Master's thesis
Year: 2009
Downloads: 179
Quote: 2
Read: Download Dissertation
Abstract
|
In today's highly developed economy , the railway is moving forward in the direction of high - speed , heavy-duty construction of high-speed rail ( passenger rail line) in line with the needs of China's economic development and national conditions . High-speed railway is bound to the use of electric traction power supply system as an important part of the electrified railway , power supply options has become one of the key factors for the development of high-speed railway . AT power supply with its own advantages , in France, Japan and other countries has been widely used, more and more the concern of China 's railway sector . PDL, using AT power supply is fully parallel traction power supply system more reasonable protection configuration and more accurate fault location put forward higher requirements . Traction Network for All Parallel AT power supply short-circuit fault , the theoretical analysis and research , to make more accurate fault location method , the traction power supply system is in good operating condition and safety of railway systems , reliable, efficient transport have significance. In this paper, the work of the various modules of the whole parallel AT power supply system modeling, and then combined into a complete model of the power supply system , and this model simulation under a variety of short-circuit fault conditions , and then make a short circuit distance with the suction on the curve of the current ratio . Then the use of the method of theoretical calculations , based on the current distribution in the AT power supply system , again calculated on the current ratio of the absorption in the short circuit case , carries it with the simulation data , we calculate the simulation fault location fault location with the traditional theory compared to the error range . Based on theoretical analysis and simulation analysis , the establishment of suction on the current required for fault ranging than the table , the fault is corrected ranging table methods to improve the accuracy of fault location .
|
Related Dissertations
- The Research on Noise Impact Evaluation Method for High-speed Railway,U238
- Research of Optimal Design of Power System in High Speed Railway,U223
- Study on the Strategies of Building High-speed Railway Urban Spatial Form and Landscape Architecture in the General Areas of High-speed Rail Site,TU984.113
- Computer network self-diagnostic system Research and Implementation,TP393.06
- Fault Localization Technology and Its Practice Based on KBC and Noise Reduction,TP311.52
- High-speed railway and tunnel wireless coverage solutions,TN929.5
- Intelligent alarm and fault location in the power grid intelligent scheduling for research,TM734
- Based GPS_GIS fault breaker Positioning System Design and Implementation,TP368.1
- Windowed Lifting Wavelet Packet in Fault Location for Research,TM755
- High-speed rail Orthotropic Steel Bridge Deck Experimental Study,U443.31
- Experimental research of Beijing - Shanghai high-speed railway in deep soft soil section bridge foundation,U443.15
- Large-span steel box basket handle arch bridge dynamic characteristics of the high-speed rail and earthquake response analysis,U442.55
- Study on Development of Road Passenger Transportation Industry of Hubei Province in Rapid Development of High-speed Railway,U492.4
- Study on the Strategies of Fujian Province Motorway Passenger Transport Vs Highspeed Rail Transport,F542
- Ballastless track high-speed railway CFG pile - raft composite foundation settlement calculation,U213.1
- High - speed railway roadbed filler Experimental Study on Improving,U214
- Study on Portable Strain Monitoring System of Mechanical Equipments for High-speed Railway,U215.6
- Study on 3D Checking System for the Ballastless Track in the High-speed Rail Way and Its Error Analysis,U216.3
- The Anti-Doppler Technology of LTE Downlink System in High-Speed Railway Scenario,U285
- WCDMA Wireless Coverage Technology Research of High-speed Railway,TN929.533
- Research of Disaster Prevention and Safety Monitoring System for High Speed Railway,U298.4
CLC: > Industrial Technology > Electrotechnical > Electrification,electrical energy application > Electric traction
© 2012 www.DissertationTopic.Net Mobile
|