Research and Implement of Dynamic CPM Optimal Algorithm Based on Constraints
Author: CaoLei
Tutor: ZhuQunXiong
School: Beijing University of Chemical Technology
Course: Applied Computer Technology
Keywords: Network Program Constraint Project Schedule Management Monte Carlo Critical Path
CLC: F282
Type: Master's thesis
Year: 2009
Downloads: 202
Quote: 2
Read: Download Dissertation
Abstract
|
Schedule management is an important part of the project management, schedule management system generated by the decomposition of the project, scheduled network planning and optimization of resources and the cost of the project to the project plan. Reasonable project schedule management and project execution, tracking and control, is the key to the success of the project. The increasing complexity of modern project requires shorter cycle, higher on-time completion rate, and lower cost. Therefore, the progress of the project management has higher feasibility, uncertainties and increasing stability. These new requirements proposed, the progress of traditional project management methods to guide project implementation process could not do. The paper systematically analyzes the defects of traditional project schedule management, as well as the advantages and difficulties in the progress of the project management with key chain, constraint conversion method is proposed to solve the problems in the progress management arrangements. The progress of the project management theory of the concept of critical chain project management, and content and traditional differences. It looks at the constraints that exist relations project, consider the psychological factors of resource constraints in the project schedule and project personnel, and to monitor the use of the buffer on the progress of the project. However, due to the problem of access to information and assessment personnel of different knowledge systems exist in the actual progress of the project management process, this article is solely from the point of view of time resources to analyze the whole progress of the management process, unified consider all of the resources at the same time, other resource constraints into the time constraints of the task, also cited the uncertainty of the duration of the 入蒙特卡罗 simulation, time management convenient schedule. In this paper, computer design and realization of the progress of the project management system, and the reference to the effectiveness of the transformation project data Sinopec Petrochemical Company of Iran to the viability and stability of the duration of the project plan as an evaluation criterion on this paper algorithm analysis . PERT / CPM project schedule and critical path scheduling constraint-based simulation model to simulate the progress of the project management system to achieve the project completion time frequency charts and statistics. Into the comparison with the traditional methods, the analysis shows, schedule management method proposed in this paper based on the constraints have a great advantage in improving the planned duration of the project feasibility and stability compared to traditional project schedule management method.
|
Related Dissertations
- Robust Control Research on Automotive Engine Idle-Speed,U464
- Transient Thermal Analysis of Multi-Body System with Complicated Boundary Conditions,TK124
- Research on Stability of Hierarchical Sattellite Network,TN927.23
- Dosimetric Characteristics of Photon Beam in the Medium Interface Region,R815
- Aerial Target Anti-interference Recognition and Tracking System,TN215
- The Expression of TH、 c-fos and Its Transcriptional Regulation in Locus Coeruleus and Adrenal Medulla on an Experimental Rat Model of Liver Depression Syndrome,R241
- Adaptive Homopoty Method Using Conjugate Gradient Algorithm for Inversion of Two-dimensional Wave Equation with Well Log Constraint,P631.81
- American Option Pricing under Stochastic Market Option Model Based on Dividend and Treatment Fees,O211.6
- Tracking Cells in High Density Image Sequences Based on Mean Shift Algorithm Combined with Topological Constraint,Q25
- The Methode of High Density Cells’ Tracking Based on Topological Constraint Combined with Hungarian Algorithm,Q25
- The Research on Budget Binding Softening Problem of the Unique Taste Food Company,F275
- Detection and Tracking of Moving Object in Complex Background,TP391.41
- Computation on Fuzzy Riemann Integral of Type Ⅱ and Order Structure on Ordered Weighted Geometric Operators,O177
- Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
- Research on Real Options Models and Applications in China,F832.5
- Applied Research of Critical Chain Management in D Company’s Nuclear Power Equipments Manufacture Project Scheduling Management,F426.61;F224
- The Study on Rock Mass Stregnth Randomenss and Reliabilityof Slope,TD854.6
- RSSI-GA-Base Static Node and Improved MCL-Base Mobile Node Localization Algorithm for Wireless Sensor Networks,TN929.5
- Research on Localization Algorithm Based on Monte Carlo in Mobile Wireless Sensor Networks,TN929.5
- Dongfeng Fengshen H30 Cross models project scope and schedule management research,F426.471
- Eastern Liaoning Japanese pine bast scale quantitative risk analysis,S763.3
CLC: > Economic > Economic planning and management > Infrastructure the economy > Infrastructure research and decision-making
© 2012 www.DissertationTopic.Net Mobile
|