Dissertation > Excellent graduate degree dissertation topics show
Lake Bridge expansion project schedule control and quality management
Author: YuDiDi
Tutor: TianHouPing;ShiFang
School: Nanjing University of Technology and Engineering
Course: Project Management
Keywords: expansion project schedule control quality management
CLC: U445.1
Type: Master's thesis
Year: 2010
Downloads: 295
Quote: 2
Read: Download Dissertation
Abstract
|
With the rapid development of national economy, the constructions of various infrastructure facilities advanced greatly. Thus, the project management has beenbecoming one of the most important procedures in the process of national economicaldevelopment. The level of management of each project not only affects theconstruction of the project itself, but also influences the development of regionaleconomy society directly. As a result, rational and scientific means must be applied tothe project management in the process of the project construction. This thesis willfocus on the Jinhu Bridge Expansion Project, making a research on its projectmanagement.The Jinhu Bridge Expansion Project(JHBEP), an important engineeringproject, is implemented to meet the needs of the construction of Jiangsu arterialhighway network, the requests of the regional economic society, the demands of theregional transportation development and the needs of flood-control anddisaster-combat. Firstly, the thesis will analyze the necessity and feasibility of theimplementation of the project management, define the goal and basic ideas of theproject management and design the organizational structure of the projectmanagement on the basis of the introduction of the bridge’s basic situation andconstruction plans. Further, the thesis will study the process management and the quality management of JHBEP. In the aspect of process management, the thesis will analyze the factors that influence the process of JinhuBridge, draw up the schedule of the item and discuss the method of process control. Inthe aspect of quality management, it will select the ways of quality control, design thequality guarantee system of the implementation of the project, analyze the keyinfluential factors of the project quality, and make up the quality control plan of theproject. Then it will determine the quality of cement beam with the mathematical statistics and the quality of pile foundation with the reflection method. In the aspect ofsafety management, it will define the goal; responsibility system and safety guaranteesystem, discuss the related technical guarantee measures and evaluate the safetymanagement with the grading coefficient.
|
Related Dissertations
- H chemical enterprises cooling loop quality control,F426.7
- Study on Schedule Plan and Control of Smart Card Appllying System for HNU,TP399-C1
- Based on the construction of a comprehensive quality management theory Shaanxi Province vocational skills certification system,C975
- Study on the Quality Management of the National Base of Training for the Vocational Teachers,G715.1
- Dushanzi ethylene plant management research laboratory quality work,F426.72
- Lanzhou Petrochemical Company of crude oil evaluation system applied research,F426.22
- Y food business management system of multi-,F426.82
- Heilongjiang Unicom WCDMA network project schedule management research,F626
- Research on Schedule Plan and Control of Shougang Cold Rolling Project,F426.31
- The Supply of Jinan Steel Foundry Sand Quality Improvement Research,TG221
- SSX Expressway Weight Charges of Project Progress Management Research,F542
- S Institute for Control of equipment production project progress,F426.4
- Project Schedule Control for the Introduction of 5S Management,F426.72
- Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
- Research on the Process Management of Research and Development Project Based on Quality Management for S Research Institute,G311
- The Application of SAP (Systems Applications and Products) in Equipment Maintenance,E92
- Progress Control Research of GS Building,TU722
- Intelligent Optimization Control in Furnace Production Process,TG307
- Zhoucun the Schedule Management of the SC Road Landscape Reconstruction Project,U418.9;U415.2
- Study on Management of Outpatient Prescription Based on Six Sigma,R197.3
- Study on Application of Six Sigma Methodology in Valve Manufacturing Industry,F273.2
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction organization and management
© 2012 www.DissertationTopic.Net Mobile
|