The Construction Control of Xiaolinghe Bridge in Jinzhou Yunfeinan Street

Author: ZuoWenBo
Tutor: QiuWenLiang
School: Dalian University of Technology
Course: Bridge and Tunnel Engineering
Keywords: Double - sets arches cable-stayed bridge Vertical Rotating Construction Stress control method Off the beam method Equivalent clearance unit
CLC: U445.4
Type: Master's thesis
Year: 2010
Downloads: 54
Quote: 0
Read: Download Dissertation

Abstract


Due to the economic , aesthetic advantages , cable-stayed bridge has become one of the most important bridge type of long-span bridges . The unique cable-stayed bridge after another, this cable-stayed bridge construction control problem is the main problem in the cable-stayed bridge construction . Small Ling Bridge engineering background , double arch tower cable-stayed bridge construction control of three key steps , the specific contents are as follows : (1) Small Ling Bridge Vertical Rotating the construction process , and use of space finite element model to simulate the entire vertical transfer process , different conditions from different angles arch tower forces and displacements calculated cable forces size to fully grasp the force of the arch tower , and actual vertical transfer process appear arch tower \(2) the unstressed length control method, calculated on the cable-stayed bridge flexible cable installation cable force . According to the actual situation of the cable tension program optimization, calculation and analysis of new tension programs , to fully grasp the cable through the installation process , to ensure the tensioning process in a safe and controlled state . Original tension program error analysis, and the actual process of tension deck load is influential to the installation of cable force is analyzed and calculated . (3) off the beam method of construction of large-span steel cable-stayed bridge control technology . Significant drop in the beam construction requirements, select the sand box as a temporary buttress , a multi-step hierarchical drop - down construction method drop for xiaoling Bridge beams . Construction controlling data according to the number of steps have been identified stars Step dips and each step of the drop- down amount , the equivalent gap element calculation method , the original calculation method has been optimized , the entire calculation process requires only one model is completed , the results Show the entire girder falling for the force security, the calculation is simple and practical . The development and application of the system to convert the drop- beam method of construction technology and gap elements method of calculating a reference value.

Related Dissertations

  1. The Stress Control Method and Its Application in Surroundding Stata Control in Stope,TD323
  2. Cracking Analysis and Tensile Stress Control Method Research for Arch Dam,TV642.4
  3. Study on Safety Risk Appraisal of Large-span Cable-stayed Bridges Construction,U445.1
  4. Fabricated T-shaped bridge transverse links of finite element analysis and reinforcement,U445.72
  5. Several key issues research in the design and construction of high and steep slope tall piers,U445.559
  6. Dongjiang Bridge Stiff Suspension Reinforced steel truss construction technology research,U445.4
  7. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  8. Ningbo-Taizhou- Wenzhou Railway Yandangshan King the superimposed arch bridge construction key technology research,U445.4
  9. Economy Bailey Truss double guide beam bridge machine assembly design and applied research,U445.36
  10. Experimental Investigation and Study on the Bridges Strengthened Using Steel Plate and Concrete Composite Strengthening Technique,U445.72
  11. The Structure Design and Optimization for the under Bridge Legs of the 900t Bridge Machine,U445.36
  12. The Construction Control for PC Continuous Beam Bridge,U445.4
  13. The Analysis of Multi-span Prestressed Concrete Continuous Girder Bridge’s Reasonable Closure Sequence,U445.4
  14. Deep-water Bridge Pile Foundation Steel Boxed Cofferdam Construction Technology Research,U445.556
  15. Active Bridge Section Consolidation Method Increases,U445.72
  16. Analysis and Research on the Shrinkage, Creep and Settlement Influence in Old Bridge Rebuilding Projects,U445.6
  17. Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
  18. Steel Sheet Pile Cofferdam Construction Technology in Winter,U445.556
  19. Research and Practice on the Road and Bridge Construction Management of Precast Beams,U445.47
  20. Deteriorations Analysis and Strenthning Study for Concrete-Filled Steel Tubular Arch Bridge,U445.7
  21. Study on Concrete Creep Theory Applied in Construction of Continuous Rigid Frame Bridge,U445.57

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net  Mobile