A Study on Cover and Cut Top Down Tunneling Technology of Long-Span Deep Underground Structure

Author: GuHongYuan
Tutor: ChenShouGen
School: Southwest Jiaotong University
Course: Bridge and Tunnel Engineering
Keywords: cover and cut up down tunneling real-time monitoring subway sections tunneling urban subway
CLC: U231.3
Type: Master's thesis
Year: 2010
Downloads: 150
Quote: 1
Read: Download Dissertation

Abstract


The Shang-Xia Shuijing subway section of Shenzhen Metro Line 5 has several important and difficult points:(1) the section is 1091m long, the longgest section with cover and cut up down tunneling. Whether the tunneling method can be successful is unsure. (2) The ground water level is high and geology is poor, which makes the water-proof very diificult. (3) The pit is 26m deep and the span is 31m in maximum, to ensuring the structure stability during the construction is very important. (4) The section is located in urban area with very busy traffic, the construction could greatly affect the safety of the adjacent buildings and road traffic. Aiming at the above key points, this study obtianed following achievements:·Numerical modeling was carried out by using the finite differential method for various structural types, based on the existed exploration and design information. The modeling showed that (1) the design of the underground continuous walls, beams and plates can meet the stability requirement. (2) as it is shallow and the structure is compressed by the soil pressure, the structure tends to be up floating and floating-resistence beam is necessary. (3) Part of the strutures may not be stable only with underground continuous walls and plates and lateral steel support is suggested. (4) Some sections are cut in pillars which could affect the structure stability and lateral steel support is suggested.·By tracing the construction and analysing the difficulties met, a set of cover and cut up down tunneling technology in long subway sections has been proposed including the construction of underground continuous walls, structure joint skills, dewatering and drainage, and the construction technology of hole-drilling grouting piles.·This study developed a real-time monitoring and warning system for super long city subway sections at the first time in China. It summarised the difficulties encountered during the development and aspects needing further improvement in order to provide useful reference to future works.

Related Dissertations

  1. Research on the Theory of the Transmission-line Metamaterials and Their Applications,O441.6
  2. Research on Dust-Isolation Technology with High Pressure Air Curtain for Mechanized Tunneling Face,TD714.4
  3. Empirical research on the behavior of the controlling shareholder of the quality of accounting earnings,F832.51;F224
  4. The Design of Automatic Control System of Experimental Stereo Garage,U491.71
  5. Research on the Wealth Tunnel to the Major Shareholder in the Private Placement Pricing,F832.51
  6. The Structure Research of Self-motion Assistanced Powered Support Equipment for Tunneling Machine,TD353.9
  7. Research of Thrust Hydraulic System of Earth Pressure Balance Shield Machine,U455.39
  8. Simulation and Analysis of Shield Tunneling Method Construction for Subway,U455.43
  9. Study of Surface Subsidence Control by Wuhan Urban Subway Shallow Tunneling Method Tunnel Construction,U455.4
  10. Logistics Warehousing Visualization and Real-time Monitoring System Research and Implementation,TP391.41
  11. Study on the Superconducting Quantum Computation with the CPBs in Superconducting Transmission Line Resonator,O469
  12. Changning District bazaars deli food security situation in Evaluation and Management Strategies,F724.3;F203
  13. The Transmission Coefficient and the Spin-tunneling Time of the F/S/F Heterojunction,O482.5
  14. The Analysis of Face Stability in Shield Tunneling on Seepage Condition and Spoke Cutter,O357.3
  15. Research on Tunneling Magneto Resistance with Time-dependent Double-delta Barrier,O482.5
  16. Fuzzy Reliability Optimization and Simulation Analysis of Highpower Reducer Based on Earth Pressure Balance Shield,U455.3
  17. Research on Accident Pre-warning Technology on Black Spots Based on Intelligent Transportation System,U495
  18. Research on Security Control of Shield Tunnel Close Under-crossing the Exist Overlap Tunnel,U455.43
  19. Stratum Deformation Discipline Monitoring and Engineering Application Research in Loess Subway Tunnel Construction,U456.3
  20. Asynchronous Sampling Based Power Quality Monitor,TM76
  21. Software Design of Real-Time Online Temperature Monitoring System in Substation High-Voltage Switchgear,TM769

CLC: > Transportation > Rail transport > Special railway > Mass Transit Railway > Subway construction , renovation and expansion
© 2012 www.DissertationTopic.Net  Mobile