Dissertation > Excellent graduate degree dissertation topics show

Performance Audit in Construction Project Application

Author: ZhaoTianHua
Tutor: WangJiaShan
School: Northeast University of Petroleum
Course: Project Management
Keywords: construction projects performance audit audit system constraint factors
CLC: F239.4
Type: Master's thesis
Year: 2011
Downloads: 169
Quote: 0
Read: Download Dissertation

Abstract


Our country lags behind other countries in infrastructure and basic industries, which has long been a bottleneck holding back the economic development. In order to accelerate the process of modernization, large-scale construction projects have to be needed. While the investment projects in infrastructures are going on in full swing, all the negative phenomena have also been exposed. Under such circumstances, the traditional audit model which was originally based on the true and legitimate audit has been unable to adapt to our current national conditions. limitations continue to highlight day by day, it has become a top priority to take great efforts to develop project performance audit.The paper, beginning by the concept, features, procedures and content of performance audit of construction projects, analyzes the related theories of performance audit of construction projects. It introduces the experiences of performance audit for foreign construction projects and the reality of our country in this field, and then the constraint factors are proposed while implementing performance audit effectively. Then, it designs the specific procedures of performance audit for construction projects, establishes evaluation indicators system of performance audit of construction projects according to certain principles, and then proposes solutions for our performance audit barriers. Through making the performance a whole process and different levels, we could largely avoid duplication, inefficient construction investment and construction, as well as detect, expose and correct the existing project problem, and then plug the loopholes in project management, prevent the loss, waste of fund, and ensure the construction quality so that the limited economic resources could attain maximum benefits. Finally, take a swimming pool construction project performance audit of one university as an examples, the role of performance audit in project construction is well demonstrated, which provides our country better solutions on how to apply the performance audit while carrying on construction project.

Related Dissertations

  1. Performance Audit in the Construction of Ecological Economic Zone Around Poyang Lake,F239.4
  2. The Research of Management of Investment of Construction of Company BG,F283
  3. The Research on Construction Project Cost Control and the Synthesized Evaluation Method,F285
  4. The Research on Process Reengineering of the Government Performance Audit in China,F239.4
  5. Construction projects outsourcing vendor selection and management,F426.92
  6. Cost Control of Chinese Military Construction Project,E235
  7. Digital Audit System Research,TP311.52
  8. China's listed banks and credit approval system operating efficiency Relations,F832.4;F224
  9. Study on Application of Performance Audit in Power Supply Enterprise,F239.4
  10. The Sustainable Research of the Xiyu Highway Construction Project,F282;F224
  11. Research on Quality Control of Thermal Power Plant Construction Project,F284
  12. Analysis of Constraints on Rural Land Contracting and Managing Rights Circulation in Ya’an City,F224
  13. Research on Internal Audit System Based on Risk Management-A Case of Group A,F239.45
  14. The Approach of Message Broadcast and Large-scale Data Transfering for Distributed Content Audit System,TP338.8
  15. The Research of Ecological Compensation Pattern for Highway Construction Projects,X322
  16. Landscape Impact Assessment of Project of Scenic Area,X820.3
  17. Construction Quality Management and Control in the Second Primary School of Long Quan,F284
  18. HKCTS Qingdao Haiquan Bay Resort Project Quality Management Study,F284
  19. The Research on Risk Management of Main Interested Parties of Large-scale Government Invested Agent-Construction Projects,F284
  20. Construction Cost Control Management Research,F284
  21. Internal Audit of Construction Projects,F239.45

CLC: > Economic > Economic planning and management > Audit > Various types of audit
© 2012 www.DissertationTopic.Net  Mobile