Dissertation > Excellent graduate degree dissertation topics show

The Key Issues’ Research about Construction Monitoring of Continuous Concrete Box Bridge

Author: HuChangSong
Tutor: JiangZengGuo
School: Wuhan University of Technology
Course: Bridge and Tunnel Engineering
Keywords: Continuous box girder bridges Construction Monitoring Alignment Control Stress control
CLC: U445.4
Type: Master's thesis
Year: 2010
Downloads: 84
Quote: 0
Read: Download Dissertation

Abstract


In recent years , the continuous concrete box girder bridge in the country has been widely used, attractive appearance, safe and reliable. At the same time span increasing , the construction process becomes more and more complex . Thus , the importance of the construction monitoring is even more prominent, and the need for structural simulation analysis , construction monitoring , collate and effective organization and management . The Construction Monitoring guaranteed basic bridge into a bridge linear force state to meet the design requirements , to ensure the quality and safety of the bridge , has an important role in modern bridge construction . Summarized at home and abroad , large span continuous box girder bridge the Ministry on the basis of structural control technology and its development trends , combined with Wu Jing speed Han North River Bridge construction monitoring instance , the factors to be important to consider in the construction , as there is for area of ??research and analysis . 1) the Midas / Covill and bridges Dr. software for structural analysis and comparison site based on high-strength concrete modulus of elasticity , shrinkage and creep simulation analysis model construction calculate the stress , strain the simulation results to guide on-site construction ; 2) the establishment of on-site construction monitoring system , to carry out the structural stress ( strain ) , the deflection and temperature monitoring , analysis of the key factors of the construction monitoring , the corresponding control measures , control section stress monitoring results ; 3 ) box girder bridge monitoring key parameters ; 4 ) explore the Wu Jing high-speed Han North River No. 2 bridge in the monitoring and management system , comparing theoretical analysis with the measured data gaps , a comprehensive analysis of the reasons , and provide a basis for future monitoring work .

Related Dissertations

  1. The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
  2. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  3. The Construction Control for PC Continuous Beam Bridge,U445.4
  4. Concrete-filled Steel Tubular Basket-handling Arch Bridge Vertical Swivel Construction Control Simulation Analysis,U445.465
  5. A Technique Research on Maintaining the Foundationpit of the Large Passenger Railway Station,U231.3
  6. Numerical Simulation and Deformation Control of Deep Foundation Pit Support of the Experimental Building in Northeastern University at Qinhuangdao,TU753
  7. Research on Application of Two Different Lengths of PVDs in Vacuum Preloading Method,TU472.33
  8. Construction Monitoring and Control of Tied-arch Bridge with Flying Swallow,U448.225
  9. New concrete block wall cracks survey and research quality defects,TU746.3
  10. Research on Monitor and Analysis of Inclined Settlement Integral Jack-Up Rectification for Xiang King’s Ancien Wall,TU746.3
  11. Analysis of Structure Simulation for Long-span Prestressed Concrete Continuous Rigid-frame Bridge,U448.23
  12. Study and Practice on Monitoring Technology of Cantilever Construction for the Songhuajiang Continuous Box Girder Bridge,U445.466
  13. Research of Construction Monitoring Technology of Basket-type Concrete Filled Steel Tube Arch Bridge,U445.4
  14. The Construction Monitoring and Controlling Cable-stayed Bridge with Inclined and Arched Tower,U448.27
  15. Research on Construction Control and Simulation of Prestressed Concrete Railway Continuous Beam Bridge,U445.57
  16. Study on Deep Metro Foundation Pit Construction Monitoring and Deformation of Nearby Road,U231.3
  17. The Alignment and Elevation Control of Long Span Continuous Rigid Frame Bridge,U445.4
  18. Key Technique Research of Continuous Rigid Frame Bridge,U448.23
  19. Construction Control Research of Steel Truss Stiffening Girder of Suspension Bridge,U448.25
  20. Support Theory and Application of Pressure-Dispersed Anchor Cantilever Retaining Wall,U417.11
  21. Construction Control of Span Continuous Rigid-Frame Bridge and Error Analysis,U445.4

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net  Mobile