Dissertation > Excellent graduate degree dissertation topics show
Study on the Cost Control and Price Forecast of the Economic Adaptive House in China
Author: LeiYu
Tutor: LiuBingNan
School: Xi'an University of Architecture and Technology
Course: Management Science and Engineering
Keywords: Affordable housing Cost control Price forecasts
CLC: F293.3
Type: Master's thesis
Year: 2010
Downloads: 209
Quote: 1
Read: Download Dissertation
Abstract
|
Chinese Confucian culture has a long history of \One can only resort to affordable housing of root \have occurred. The paper first introduces the concept of affordable housing and the development process, to analyze the reality of the problems exposed instance, arise seemingly difficult to reconcile the contradictions, but according to China each year for the delivery of affordable housing funds total residential investment The proportion found, the countries not only is not stagnant investment, but also to make great efforts to the development of affordable housing. The papers to housing construction in the United States for instance, to learn from the United States as one of the more successful countries to solve the housing problem in the world has introduced policies to solve the problems facing our country resolved. Second split the price of the affordable housing, and to identify the factors that affect the price. The increase in land demolition and resettlement costs, rising raw material prices led to steel and cement building directly impact on prices. Rigid housing demand caused by the influx of a large number of rural population increase, the constantly adjusted financial policies indirect impact on prices. I believe that affordable housing prices influencing factors, some human can be regulated. In practice, only the cost down to price unreasonable moisture squeezed out, so the article were from the government and developers point of view of cost control. Cost control from the government's point of view, is to control the land, building area, building design, lending policies; from the developers point of view of cost control is to control its direct costs and indirect costs to control the direct construction cost. With the exponential smoothing Gong Bozi model two prediction methods, to second-tier cities (Xi'an), for example, to predict the price growth trend of its affordable housing over the next four years. Then according to the reality of the two predicted results gives different weights to predict the price again, the prediction results more realistic and scientific. Finally, strengthen macroeconomic management, a clear buy objects and construction standards, facilities, property rights, financial support and other aspects related policies to further improve our affordable housing. This paper argues that, in many policies, the first is to strengthen the division and audit of the purchase object, namely the establishment of a mature national the networked personal income information inquiry system to put an end to the purchase of high-income people, or for \affordable housing, give a certain punishment, to avoid disrupting safeguard the fairness of the policy. Second is cut off the source of the profits, while the implementation of the government of the \to eliminate and avoid problems.
|
Related Dissertations
- Vocational Training Base Construction Project Cost Control,G712.4
- JF company \,F426.72
- Housing security of migrant workers in Chongqing Research,D412.6
- DB logistics company operating system problems and countermeasures,F259.23
- Research on Manufacturing Cost Control Strategy for Sichuan BS Company,F426.6
- Study of the Cost and Cost Control of Venous Industey in Coal Mining Area,F406.72
- Analysis and Control of Several Classes of Singular Networked Systems,O231
- Change the Z Project Cost Control Research,F285
- The XY company cost control analysis,F426.8
- On the \,D923;F293.3
- Study on Fault-tolerant Guaranteed Cost Control for Nonlinear Systems,TP13
- Based on fuzzy reasoning annular multi -stage inverted pendulum modeling and control,TP13
- 3G base station access project cost control and management,F626.116
- A class of uncertain linear discrete delay singularly perturbed systems Guaranteed Cost Robust Control and Research,TP13
- For innovative enterprises quality cost control and optimization studies,F273.2
- Auto Production Line Project Cost Management,U468
- Earned Value Analysis in infrastructure projects, private colleges in the application of cost control,G648.7
- The Reseacher on the Supply System of Public House in Hangzhou,F293.3
- The Real Estate Project Prior-Cost Control Study,F293.33
- Study on Displaying Implicit Cost in Construction Project,F285
- Research on Cost Control Technology for Design Phase of Motorcar Product,U462
CLC: > Economic > Economic planning and management > Urban and municipal economy > Urban Economics and Management > The real estate economy
© 2012 www.DissertationTopic.Net Mobile
|