Dissertation > Excellent graduate degree dissertation topics show
The Study on the Reasonable Spacing Arrangement of CFG Piles for the Treatment of Soft Ground in High-Speed Railway
Author: ChenHong
Tutor: LiYuanFu;YangZuo
School: Southwest Jiaotong University
Course: Architecture and Civil Engineering
Keywords: Railway soft ground CFG pile pile distance
CLC: U213.1
Type: Master's thesis
Year: 2008
Downloads: 303
Quote: 3
Read: Download Dissertation
Abstract
|
Some main achievements of this thesis are based on the Dacheng railway reconstruction project, which study on the comprehensive construction technology and standard of 200~250km per hour passenger and freight mixed railway. Having done some researches, which are the locale testing, centrifuge testing and analysis using software programme SIGMA/W.The locale testing indicates that, the soft ground composited with CFG piles can meet the requirement of design. The settlement of the surface of the under grade increased as the increasement of the load, but the sum settlement can still fulfill the requirement. The x-displacement also had great development, which was steady when the height of the under grade meet the design requirement.The centrifuge testing was done for simulating the typical transect of the soft ground composited with CFG piles. There are five groups of centrifuge testing with different distance between each pile. Some research are did on the stress and strain of the under grade, foundation and CFG piles. The testing indicate that, the distance between each pile strongly impact the steady of the foundation.The SIGMA/W programme is used to simulate the stress and settlement of the soft ground composited with CFG piles, and analyze the effect of the restrength with different distance of each pile. The calculating indicate that, the settlement of the under grade and the strength of the CFG piles can meet the requirement of the criterion, when the distance of each pile≤2.5m.According to the field test and theory calculation ,it can be obtained that using the three-four times CFG spacing(1.5~2.0m) for the treatment of soft base can statisfied the specifacation requirement ,and save engeeing cost 1/4. so this design shows significant economic benifit, and have vigorus extension in future similar engeering.
|
Related Dissertations
- The Analysis on Characteris of Vibration Source about Vertical Vibration of Surrounding Environment Induced by Rail Transit,U211.3
- Research on the Revenue Distribution of PPP Mode about High-speed Railway Project,F283
- A Study on the Marketing Strategy of Shanghai-Nanjing High-speed Railway Based on Consumers’ Behavior Theories,F532
- The Study on the Process Operating Management Model of NanJing Metro,F572.88
- Study on Spatial Development Patterns and Planning Countermeasures of "high-speed Railway New Town" Along Beijing-Guangzhou High-speed Railway,TU984.113
- Research on Double-grouting Consolidation Slope,U418.52
- Analysis of Steel Box Girder Double Arch Bridge of High Speed Railway,U448.22
- Research on Grouting Treatment of the Soft Soil Foundation Reinforcement in Langcang Freeway,U416.1
- Reinforcement effect of high-speed railway soft ground based on the engineering properties of the soil test research,U213.15
- Ballastless track high-speed railway CFG pile - raft composite foundation settlement calculation,U213.1
- CFG Pile Composite Foundation Mechanical Behavior and Its Application,TU473.1
- Experimental Study on Application of CFG Pile in Qingdao,TU473.1
- Analysis of Bearing Capacity of Cement Deep Mixing Column in Soil Improvement,TU473.1
- Investigation on the Subgrade Deformation Due to Widening Expressway on Soft Groundwork,U416.1
- The Project Financing Plan of Jinan West Railway Station Area’s Exploitation,F532
- Comparison and Analysis on the Types of the High-Speed Railway Transition Curves and Vehicle Dynamic Behavior,U270.11
- Study on Taxplanning of Huaihua Railway Enterprises,F530.68
- Research on the Land Developing Strategy of Inter-city Rail Transportation Hub in Changzhou,TU984.113
- Design Research for the Square in Front of Railway Station,TU984.18
- Research into the Rail Freight Forecasting by the Grey Systems Theory,F224;U294.13
- A Research on Economic Contacts among Cities along the Lanzhou-Urumqi Railway,F299.27
CLC: > Transportation > Rail transport > Railway Line Project > Line constructed > Subgrade