|
In the project investment control of the entire process , the design phase is to do the entire project investment control is very critical stage , in reality, only pay attention to the construction phase and project feasibility study stage , ignoring the design stage based investment control . As a construction project , one of the three control targets investment control, just stay in our country is still in the construction phase of the supervision work, in fact, investment in the construction phase for control is not a real sense of investment control, but to control the implementation of the project the process may increase the cost of new , this control is necessary, but the effect is limited , so after the control size and functionality of the Project are to determine the circumstances , to a certain extent control the waste and save construction cost , and it the maximum effect can only be reduced to zero waste . But the economic benefits for the entire construction drop in the bucket , so to realize the true economics of the construction project , the focus of the work extends to the construction of the design process is necessary and economical. Investment in our project period of rapid growth , based on the design phase of the project investment control remains weak areas , caused by poor investment control runaway phenomenon is still a lot of engineering investment . This study emphasizes the design stage for the investment control provides practical significance. This paper analyzes the current status of the project investment control and existing problems , propose to enhance the design stage of the project based on the importance of controlling investment . Mainly discusses the design stage investment control based meaning construction project cost structure, content and design phase of the investment based on the design phase of the main tasks and workflow control , and according to previous experience and personal work practices , raise the standard design and design standards , value engineering design implementation process and limit the lateral and vertical control , from the system , methods and measures up to complete the design phase of the project -based investment control , fundamentally achieve control project investment purposes.
|