With the rapid development of China's national economy and infrastructure continues to expand, the construction cost is seriously plaguing the efficiency of investment construction projects over budget estimates, budget over budget , over budget accounts of the \exists. Raising the level of project cost management is reasonable assurance that the project cost and effective to control , the aim is not just in the approval within the scope of the project , it is to the rational use of resources , benefits have been expanded. Xuchang Vocational and Technical College Gymnasium project covers an area of about 60 acres, divided into the main hall and gymnasium training hall , indoor and outdoor building height is 0.6m. GFA : 15985.69m2, including underground 2011.5m2, ground floor area : 13974.19m2, building basement area : 10069.03m2. Built for energy contractor handball , basketball , volleyball, table tennis, tennis , gymnastics , weightlifting and other national individual competition , but also as a convention , entertainment and other activities, not only the city's major sports can change the status quo of inadequate facilities to meet the city's mass cultural and sports activities need , while improving urban functions, improve the city's image , expand the opening will also have a positive impact. In this paper, Xuchang Vocational and Technical College Gymnasium project as a typical case , with the construction project cost determination and control of the basic theory to guide the decision-making of the project , design and implementation of the three phases of project cost management, and strive to seek the best and most feasible project cost control methods and measures . Through the static and dynamic investment investment component estimation methods research , decision-making phase of the project 's construction cost control ; analysis and design phase of the significance of cost control and cost management in the design phase of the status quo , building design stage of project cost control , the use of value engineering approach to cost control studies ; bill of quantities based mode bidding stage project cost control , the dynamic construction phase of project cost control and completion of the settlement stage construction cost control measures discussed , the whole process of implementation of the project for effective control , efforts to reduce the project cost.
|