Abstract
|
With a span of 140 meters, the TingSi Bridge is a steel box through fled-arch bridge of Wuhan—Guangzhou passenger dedicated line. It adopts the orbit CRTS-type double block of ballastless track. it is composed with bored concrete pile in large water-eroded cave, and 140m steel box bowstring arch bridge,and big span steel bridge with ballastless track.So,it has large quantities of high difficulty, technology, complex. Before the completion of TingSi Bridge The bridge which had been built in the biggest span was French high-speed railway Avignon Mediterranean Sud bowstring arch steel box, mainly for 124 meters. Now, TingSi Bridge with span of 140 meters is the world’s largest steel box of the bowstring arch bridge and It across the north-south highway traffic of Beijing to zhuhai expressway. It is very important of the construction safety and difficulty.The process of construction is introduced in detai in this paper. Main work of this paper is as follows:1 A detailed introduction of how to take effective measures to solve the teachical difficulties of water-eroded cave with long pile construction in karst region, plagioclase, sediment control and quality control of the underwater concrete pouring.2 Studied the difficulty and main point in the assembly process of the TingSi bridge steel box bowstring arch bridge. Some operating points for attention of the assembling process and construction method are introduced. Consider the temporary order of beams hoisting comprehensively, and use the stiffness of the cantilever beam to assemble automatically instead of decorating a temporary pier beam assembly platform; Don’t set arch rib assembled by rigid suspenders, but use the rigid boom as the main subject to strengthen the lateral linkage and direct arch rib robs on the boom assembly.3 A detailed study to the method of deformation observation and control By using this method we can avoid the load and the temperature effect on the deformation of the track. Then based on the measured data of bridge theory and control of data analysis, we guide the steel bridge assembly and no residue rail construction to ensure the final line of steel bridge in design allows error range.4 A detailed discourse about the characteristics of long-span steel box without slag rail and how to take effective measures to ensure the final orbit in the process of construction.5 Detailed study how to adopt effective protection scheme and increase protection facilities, to ensure expressway traffic and construction safety during the construction of TingSi 140 metre steel box bowstring arch bridge
|
Related Dissertations
- Research on the Revenue Distribution of PPP Mode about High-speed Railway Project,F283
- Study on Spatial Development Patterns and Planning Countermeasures of "high-speed Railway New Town" Along Beijing-Guangzhou High-speed Railway,TU984.113
- The Research of the Influence by the Materials of High-speed Railway Station Waiting Room on Sound Environment,TU112
- High - speed railway bridges mitigation and isolation,U442.55
- The high-speed railway bridge performance - based seismic design method,U442.55
- Elastoplastic seismic response analysis of high - speed railway bridges,U441.3
- Ballastless track high-speed railway CFG pile - raft composite foundation settlement calculation,U213.1
- The Research on the Urban High-Speed Railway Station’s Front Square Environmental Design,J525
- Study on Green Mode and Optimizing of Shanghai-NanjingHigh-speed Railway,S731.8
- Research on Initial Deformation Limit Index for Long-span Passenger Dedicated Railway Ballastless Track Bridge,U448.13
- High-speed rail bridge prestressed RPC Fatigue Reliability Design Method,U441.4
- Research of Decision Support System for the Maintenance of Ground Equipment of High Speed Railway Train Control System,U284.48
- Analysis of the Longitudinal Force of Single Seamless Turnout of Slab Track on Bridge,U213.244
- Study on the Control Standard of Filler and Inspection Tecchnology for the High-speed Railway Subgrade in Gobi Area,U213.1
- Influential Factors Analysis of Longitudinal Force on Bridges with CRTS Ⅱ-Type Slab Ballastless Track,U213.244
- Key Technology Research of Long-span Prestressed Concrete Continous Girder Bridge in High-speed Railway,U448.35
- Application Studies on the Polyurea Protection Technology for Bridge Concrete of Beijing-Shanghai High Speed Railway,U444
- Study on 3D Checking System for the Ballastless Track in the High-speed Rail Way and Its Error Analysis,U216.3
- Box girder bridge sunshine temperature distribution law and computing model of the high-speed rail,U441.5
- The Study of Information Interaction of the High-Speed Railway Integrated Dispatching System Based on SOA,TP311.52
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net Mobile
|