Dissertation > Excellent graduate degree dissertation topics show

The Prestress Tensioning Time Research of Cast-in-place Prestressed Concrete Continuous Beam Bridge in Construction and Deformation Control

Author: MaZhen
Tutor: YuDeHu;ZhangTongBo
School: Qingdao Technological University
Course: Structural Engineering
Keywords: cantilevered concreting method prestressed tensioning tensioning time bridge formation control reliability
CLC: U441.5
Type: Master's thesis
Year: 2010
Downloads: 52
Quote: 0
Read: Download Dissertation

Abstract


Nowadays, long span continuous beam bridges are always constructed with cast-in-place cantilever construction technology, which could be finished in a compared short time without lower support beams, but has some possibilities of accidents because of unreasoned prestress tensioning. Therefore, we should keep on theory researching of prestress tensioning in construction cantilevers long span continuous beam bridges, to make sure construction schedules of prestress tensioning in different air temperature, to find out the rule of time influencing on prestress tensioning, to reinforce the control of bridges’. This is the background of this research.First, based on maturity grade theory, established the relationship of concrete compressive strength and maturity. According with different curing temperature in different construction condition, this article gave estimating formulas of early concrete strength, to lay a foundation of theoretical analysis and numerical calculation of subsequent chapters.Second, introduced the basic concept of prestressed concrete, described types of construction load in prestressed reinforced concrete structure’s cantilever construction period, explained internal force analysis method of stress system of bridge, established calculation model of familiar prestressed continuous beam bridge, to lay a foundation of load effect analysis in subsequent chapters.Third, according to strength failure criterion, in add to considering design condition of prestressed concrete beam bridge in construction period, worked out a method to determine concrete strength while prestressed tensioning, with an engineering example to calculated. Then this article analysis the rule of the form of prestressing tendons to influence tension strength.Forth, considering factors that make prestressed tensioning time uncertain, according to reliability theory, this article pointed out instead of take strength only into account, which was not safe enough, we should consider reliability index and strength all together. Then work out prestressed tensioning time determination method, to coach engineering practice.At last, beginning with calculation method of concrete vertical deformation and summing-up of project experience, to find out main factors influenced concrete vertical deformation. Then illustrated these main control factors with practical engineering project of Xuluote bridge in passenger dedicated line from Shijiazhuang to Wuhan.

Related Dissertations

  1. Development and Preliminary Application of the Questionnaire on Emotional Labour of the Middle School Teacher,B841
  2. The Research on Reliability of Low-Voltage Power Line Communication,TM73
  3. The Research and Application of Software Reliability Test for User Right Management System,TP311.53
  4. Research on Subsea Pipeline Repair Coupling,TE973
  5. Research and Application on Reliability Technology of Mine Hidrological Monitoring System,TD742.1
  6. Body Sensor Networks Adaptive Communication Protocol,TP212.9
  7. Periodic testing of the storage system reliability model,O213.2
  8. Amendment of Mental Health Evaluation Scale for Chinese Nuclear Power Plant Operators,B849
  9. Degradation of Amorphous Silicon Thin Film Transistors under Gate and Drain Voltage Bias Stress,TN321.5
  10. Application of the Coal-powered Anti-grade Trip Protection System,TM732
  11. Improvement and Realization of AODV in Wireless Sensor Networks,TP212.9
  12. Reliability-based Sensitivity Research on Multi-span Rotor System,TH113
  13. High-Reliability Distributed iSCSI Storage System Based on Double-Stage RAID,TP333
  14. The Research and Implementation of Energy-efficient RAID,TP333
  15. Reliability and Security Study of the Digital Substation System,TM732
  16. DURO: A New Online Reconstruction Optimization for Single-disk-failure of RAID-6,TP333
  17. The construction of the thermal power plant enterprise information portal,F426.61
  18. Study on Management for Single Storey Industrial Building Reliability Evaluation,TU311.2
  19. Seismic Reliability Analysis of Urban Water Supply Pipeline System,TU991.33
  20. Research on Wide Area Backup Protection Based on Centralized Decision-making,TM774
  21. Study on Applying Hierarchy of Needs Theory and Human Caring Theory to Construct the Optimal Companion Model,R47

CLC: > Transportation > Road transport > Bridges and Culverts > Structural principles, structural mechanics > Stress analysis, thermal stress
© 2012 www.DissertationTopic.Net  Mobile