Project Cost Control Research of Cost Consultation Unit in Design Stage
Author: YuanChunLin
Tutor: CaoXiaoLin;ZhangTingXue
School: Chongqing University
Course: Architecture and Civil Engineering
Keywords: Design phase Cost Consulting Unit Cost Control The design limits
CLC: F284
Type: Master's thesis
Year: 2008
Downloads: 498
Quote: 0
Read: Download Dissertation
Abstract
|
Design stage of the shortest average time for the entire project life cycle , funds invested at least , and it is the shortest invest at least this time the design stage , but then the cost of the entire project plays a key role , and its impact on the entire project cost the extent of 75% to 95% , and currently there are a lot of loopholes in the design phase of the project cost control , making the design phase of the project cost control is the first design afterwards , the total cost is equal to the cost of the various aspects of arithmetic and lack of system design the stage project cost control philosophy and control mode , hinder the development of our cost management level , and to weaken the strength of competition and cost management industry . Therefore, scientific and reasonable cost control design stage , to establish a sound operational cost control system , an important issue at this stage of construction cost management reform and restructuring . Based on previous research background , the analysis of domestic and international cost control status, recognizing the challenges and opportunities to our design phase cost control with the accession to the WTO , to re- determine the main design phase cost control - cost consulting units . Article standing the cost consulting unit height , angle and full cost control starting from the design stage of the whole process of cost control , the first division together to control the cost of the design phase is divided into several levels , program design stage , the analysis of the preliminary design stage and construction drawing design stage , cost control , cost control method and theoretical analysis of the existing design phase , and designed on the basis of a cost consulting units of the design phase control of the whole process of cost control method . Including the shift of control the main cost of the design phase , the design phase of cost control program development , and its concept of cost forecast detailed demonstration of the method , the other to determine the cost of commitment and the distribution of benefits , and recommended to take reasonable incentives of the design phase of the construction cost control maximum possible implementations . The design of the entire control methods are considered from the point of view of cost consulting units , combined with practical and built on the basis of a large number of facts , very practical feasibility , cost consulting units cost control at the design stage will greatly improve efficiency , is conducive to the cost control work operability .
|
Related Dissertations
- Vocational Training Base Construction Project Cost Control,G712.4
- JF company \,F426.72
- DB logistics company operating system problems and countermeasures,F259.23
- Research on Manufacturing Cost Control Strategy for Sichuan BS Company,F426.6
- The Research on the Cost Management of Manufacturing Industry Based on Resource Consumption Accounting,F406.72
- Study of the Cost and Cost Control of Venous Industey in Coal Mining Area,F406.72
- Analysis and Control of Several Classes of Singular Networked Systems,O231
- Change the Z Project Cost Control Research,F285
- The XY company cost control analysis,F426.8
- Study on Fault-tolerant Guaranteed Cost Control for Nonlinear Systems,TP13
- Based on fuzzy reasoning annular multi -stage inverted pendulum modeling and control,TP13
- 3G base station access project cost control and management,F626.116
- A class of uncertain linear discrete delay singularly perturbed systems Guaranteed Cost Robust Control and Research,TP13
- For innovative enterprises quality cost control and optimization studies,F273.2
- Auto Production Line Project Cost Management,U468
- Earned Value Analysis in infrastructure projects, private colleges in the application of cost control,G648.7
- The Real Estate Project Prior-Cost Control Study,F293.33
- Study on Displaying Implicit Cost in Construction Project,F285
- Research on Cost Control Technology for Design Phase of Motorcar Product,U462
- The Management and Control of Computer Virus Response Project Oriented,TP309.5
- H Company Vehicle Logistics Cost Control of Projects,F426.471
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|