Dissertation > Excellent graduate degree dissertation topics show
Study Problem and Countermeasure on Project General Contract in Chain
Author: ChenShuLin
Tutor: CaoXiaoLin;GuZhengNian
School: Chongqing University
Course: Construction Management and Real Estate
Keywords: Construction Engineering General Contracting Project Management Problems Countermeasure
CLC: F284
Type: Master's thesis
Year: 2008
Downloads: 739
Quote: 1
Read: Download Dissertation
Abstract
|
The general contractor of the project management is an effective method of construction project management , has been widely used in the international market . The method enables the construction management of a systematic , advanced , owners and construction companies save money , improve the investment returns of the project . China 's construction project management activities carried out earlier , but its development is slow , especially in modern times, China 's construction project management level is significantly lagging behind the developed Western countries , there is construction management organization structure is irrational, not completely straighten out the management system , owners behavior is not standardized and do not study the general contracting management model , not through the problem. The historical background of departure from the management of construction projects at home and abroad , explore the history of the development of the construction project management exist by comparison with foreign construction project management , analysis of construction project management in the application and development of our country ; the problems and deficiencies ; combination of practical experience of many years engaged in the management of construction projects , from the theoretical and practical aspects of the problem and its causes construction general contracting management process , a comprehensive , in-depth research ; against the emergence of the problems raised in the engineering construction construction project general contracting management model must measure from the regulation of general contracting scale , to rationalize general contracting management mechanism , establish and improve laws and regulations , norms owners behavior and improve the general contracting management level and competitiveness of with international standards as soon as possible , promoting the management of construction projects in China has a certain value for references .
|
Related Dissertations
- An Empirical Study of Contemporary Compehensive Urban Design in China,TU984
- Kunming Transient Population Community Present Situation, Question and Countermeasure Preliminary Study,C924.25
- Yunnan Province, the private high ideological and political course of the situation and developing strategies,G633.2
- Relationship of the traditional Hmong culture and Hmong education,G759.2
- A Study on the Problems of Girls’ Basic Education in Nigeria,G543.7
- On Perspective of New Problems in Building a Harmonious Socialist Society,D61
- Study on Student Management of Rural Boarding School in China,G471
- An Investigation Report on the Professional Development of Head Teacher in Foshan Municipality,G451.1
- Research on Textbook Origin of Mathematical Problems in College Entrance Examination,G633.6
- The Study about Carrying Out Low-carbon Education in the Teaching of Geography in the Middle School,G633.55
- Research on Setting Innovation Problems of Mathematics in College Entrance Examination,G633.6
- On Civilian-run Colleges and Universities Issue and Its Internal Management System to Improve,G647
- A Study on University Science and Technology Innovation Environment Evaluation,G644
- A Study on Problems and Strategies of Students’ Participation in Classroom Teaching in Vocational High School,G712
- Research on the Developing Situation and the Countermeasures of Guilin’s Outdoor Sports Clubs,G895
- Study on the Problem of the Rural Middle School Students Who Have Difficulties in Learning,G635.1
- On the Curriculum Reform of the Basic Education: the Problems and Solutions,G632.3
- Guangzhou High School Biology Teaching Effective Study Present Situation and Countermeasures,G633.91
- Study on the Secondary Vocational Education Served the Development of County Social Economy,G718.3
- The Public Policy Research on Compulsory Education Gap between Rural and Urban,G522.3
- The Problems and Strategies of Composition Teaching in the Senior High School in the Background of New Curriculum Reform,G633.34
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|