Dissertation > Excellent graduate degree dissertation topics show

Technology Research on the Prefabrication and Marine Transport for 70m Prestressed Concrete Box Girder

Author: YeChangYong
Tutor: HaoXianWu
School: Chang'an University
Course: Architecture and Civil Engineering
Keywords: Hangzhou Bay bridge crack control maritime transport Construction technology
CLC: U445.471
Type: Master's thesis
Year: 2009
Downloads: 45
Quote: 0
Read: Download Dissertation

Abstract


Combining with the construction experiences of Hangzhou Bay Bridge , through the test study of various behaviors of marine structure concrete and analytical study of measurements of temperature gradients and stress in the actual girder made up of the concrete, a kind of early time tensioning workmanship when concrete strength is still low is put forward. With the workmanship for tensioning the partial prestressing strands, the possible cracks due to temperature stress in the large size thin-walled box girder can be controlled, and the problem of cracks in the marine structure concrete easily caused by the low water/binder ratio of, and multiple compositions and considerable adding amount of admixtures in the concrete is thus resolved, so it soluted some questions of box girder’s quality and Integrity.Through the research technology of manufacture Integrity and erect of 70m, proposed a plan about long and big bridge in environment of sea. Through the research and innovation made for workmanship, schemes and construction equipment for casting concrete of 2,200-t large volume box girder, an amount of 830 m~3 concrete to be cast at one time without stop is realized, and the workmanship and construction method for casting large volume and large tonnage girder have thus been developed and perfected.Through the research of workmanship for integral lifting and setting of large size interior formwork and reinforcement skeleton, the construction efficiency and quality have been greatly improved and gradually, the workmanship has been developed into a fixed construction method.The 17-m span vibrating bridge for deck concrete construction is developed. With the developed vibrating bridge, the evenness of the deck can be ensured, the occurrence of cracks in the deck can be effectively avoided, and the common quality problem in the deck concrete construction is thus eliminated.

Related Dissertations

  1. Design and Implementation of the Three-Dimensional Display in Fashion Brand Promotion,TP391.41
  2. Study on Techniques of Crack Control in Concrete Structures,TU755
  3. Crack Control of Reinforced Concrete Beams model test,TU398.9
  4. Research on Cause and Preventive Measures of Fracture for Small Concrete Block Building,TU746.3
  5. Volume Change Load and Stress Analysis of Wall,TU312.1
  6. Prevent cracking of the concrete cable-stayed bridge pylon Control Method,U445.57
  7. Long concrete structure temperature effect analysis and crack control,TU375
  8. The Mechanical Analysis and Controlling Research on Crack of Super-length Basement Concrete Slab,TU755
  9. Mechanism Analysis and control of ultra-long Concrete Basement Wall Cracks,TU755
  10. Research on Temperature-Controlling Measures and Crack Controlling Measures about Certain Water Sluice Project,TV544
  11. Bridge and Tunnel Structure of Durability and Surface Protective Materials in Engineering,U457
  12. Research on YAG Laser Cutting of Soda-Lime Glass with Controlled Fracture,TQ171.683
  13. A Technique Research on Maintaining the Foundationpit of the Large Passenger Railway Station,U231.3
  14. Study on Crushing Parameter for Old Cement Concret Pavement and Overlay Structure,U416.216
  15. Applied Technology Research on Hard Asphalt Concrete,U414
  16. Research on Design Method of Material Composition for Small Grain Size Asphalt Mixture Based on Practical Function,U414
  17. Performance Evaluation and Construction Technology on Shading Pavement,U416.2
  18. Circular Prestressed Concrete pillars of anti longitudinal research,U225.42
  19. Research on Performance Evaluation System for High Modulus Asphalt Concrete,U414
  20. Long slab cracking of concrete frame,TU755

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology > Bridge manufacturing > Concrete and reinforced concrete beam manufacturing
© 2012 www.DissertationTopic.Net  Mobile