Keywords: Routes were added to Railway hub Comparison and Selection AHP- Fuzzy Comprehensive Evaluation
CLC: U212.3
Type: Master's thesis
Year: 2010
Downloads: 19
Quote: 0
Read: Download Dissertation

Abstract


New railway projects , the line into hub scheme comparison evaluation is a very important decision . In this paper, the study of the relevant literature in the field , found that the routes were added to the hub program comparison evaluation is relatively small and there are some flaws , such as the evaluation index system is imperfect , evaluation methods for qualitative analysis . Order to fully construct evaluation index system, the introduction of a hub case study on the existing design document has been approved by the Ministry of Railways line , including four railway hub , 34 recommended programs and analysis of its superior than the alternatives , disadvantage , reached the 23 indicators factors . Attributed to these factors the key factor , the second key factor and non-critical factors into three categories, and the degree of importance of the three factors were assigned , and then the weight formula obtained each influencing factor in the program important than the election process the specific values ??for indicators important analysis provides a quantitative basis . In this paper, the applicability and advantages and disadvantages of some commonly used evaluation methods , fuzzy analytic hierarchy process line has good applicability comparison evaluation of the introduction of the hub program . Integration of previously analyzed the impact of factors , building evaluation index system, and to determine the factors Ci of the six -level indicators and 23 secondary indicators Sort Hierarchy factor c . The right value . Then , the establishment of the comment set V = VK = ( V1 , V2, V3 , V4 , V5 ) = ( excellent , good , fair, poor , very poor) , while establishing reviews from the factors set C to set V fuzzy relation matrix R , further define the primary and secondary fuzzy comprehensive evaluation approach to filter out the recommended program through the final composite score . Finally, this paper \By technical and economic comparison of five specific programs , build tables and rigorous program evaluation , objective calculation , draw comprehensive evaluation score of five programs were 53.52,48.58,64.16,52.78.54.24 , select the highest score program I - 3 is the recommended program . Evaluation model is reasonable by an example , the evaluation system and evaluation methods in line with the policy ideas and requirements , has a certain practical value .

Related Dissertations

  1. Research and Realization of Atc Communication Coverage Optimization Based on Voice Singal Voter,TN914
  2. Study and Application of Post Evaluation in New Product Development Project Based on Fuzzy Comprehensive and Grey Correlation Analysis,TB497
  3. Research on Comparison and Selection of Hydropower Station Intake Structure Analysis Program,TV732.1
  4. Design Status Evaluation System of Wind Power Generation Equipments,TM76
  5. Research on Flying Swallow Profiled Conceret-filled Steel Tube Arch Bridge Structured Analysis and Aseismatic Damper Design,U442.55
  6. Research on Capacity Expansion and Reform of Marshalling Yard in Kunming Railway Hub,U291.41
  7. Research on the Freght Station Layout Adapting to the Development of Modern Logistics in the Railway Terminal,U291.5
  8. Railway Passenger Terminal Layout,U291.6
  9. Evaluate the Online Shopping about Taobao by AHP-fuzzy Comprehensive Evaluation,F724.6
  10. Study on Highway Construction Social Benefit Post-evaluation,F542
  11. Span roof structure of the thermal power plant steam room scheme comparison,TU231
  12. Application and Opiminzing Method on Research of Foundation Pit Supporting,TU753
  13. Urban Natural Gas Pipe Network Engineering of Henan Province-Luohe Ubproject Gas Storage Scheme Comparison and Selection,TU996
  14. Study in Issue of Chinese Rural Old-Age Insurance Fund Value-Added,F842.6
  15. Application of AHP and Fuzzy Synthetic Evaluation in Risk Assessment of Wildlife Emerging Infectious Diseases,S851.31
  16. Research on the Coordination of Capacity between Lines and Stations within the Railway Terminal,U291
  17. The Analysis of the Chief Raliway Alignment Selection Based on Green Conception,F532
  18. Lanzhou Logistics of Dangerous Goods Feasibility Analysis,F224
  19. Dalian Railway Freight Station building a logistics center study,U294;F224
  20. Research on Risk Assessment for Operation Support System Transformation Project of H Telecom Company,F626

CLC: > Transportation > Rail transport > Railway Line Project > Line planning, surveying and design > Circuit design
© 2012 www.DissertationTopic.Net  Mobile