Dissertation > Excellent graduate degree dissertation topics show

Construction Guarantee Risk Early Warning Mechanism Research

Author: LiZhiGuo
Tutor: WangZuHe
School: Shandong University of Science and Technology
Course: Structural Engineering
Keywords: Engineering guarantee Project guarantee risk VaR AHP delphi method risk early-warming
CLC: TU71
Type: Master's thesis
Year: 2011
Downloads: 80
Quote: 0
Read: Download Dissertation

Abstract


China impels the engineering guarantee system to avoid the risk and maintain the market order. It’s a good method to guarantee the building and ensure the participates meet theirs engagements.We have got some more improvement.one of the problem is how to build an effective risk control system.This paper mainly work in an all-round and systematic research of the construction project of the security risk management. The first is to guarantee and engineering guarantee related engineering theory, this paper summarizes the current engineering guarantee agencies and guarantee pricing for an overall summary and analysis the current pricing theory and practices of some defects, and at the same time introducing VaR theory, this paper proposes a project guarantee risk pricing method. Finally built the construction project of the security risk index system, and using AHP and the Delphi method of construction engineering of the method of combining the risk guarantee warning, and according to the risk of early warning that trend of the corresponding risk treatment.Engineering guarantee is a high risk rank,so an effective system can help the organization to avoid the risk and insure the quality of the building and the contract can finish on time. It can also insure the payment and improve the healthy development of the engineering assure system and the architecture.

Related Dissertations

  1. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  2. Highland lakes Lakes sustainable development assessment system and model,X22
  3. The Reaserch and Application of Fuzzy AHP,O225
  4. Cadmium, Chromium and Lead Accumlation, Distribution in Aralia Elata Var. Inermia and Their Effect on Leaf Antioxidative System,S792
  5. The Selection of Leading Industry and Industry Distribution in Environmentally Vulnerable Area,X321
  6. Research on the Soil Environmental Function Zoning,X321
  7. Study on Fuel Supply of Henan Straw Power Generation,TM619
  8. Preparation and Biological Effects of a Bio-Organic Fertilizer Against Tobacco Black Shank Disease,S435.72
  9. Studies on Agrobacterium-midiated Genetic Transformation in Brassica Campestris Subsp. Chinensis Var. Parachinensis,S634.5
  10. Daxinganling forest areas Pinus sylvestris tree-ring δ \u003csup\u003e 13 \u003c / sup \u003e C of the climate significance,S791.253
  11. A Comprehensive Evaluation of Heritage Trees,S788
  12. Physio-Biochemiscal Responses of Seed Germination and Seedling of Sweet Pepper under NaCl Stress,S641.3
  13. Copula-EGARCH-Kernel Density Estimation Model and Its Application,O211.3
  14. Study of Evaluation System on Security Management of HS Company,F426.21
  15. Study on Fitness of Backcross Generations between Glyphosate-Resistant Transgenic Oilseed Rape and Four Geographic Populations of Wild Brassica Juncea,S565.4
  16. Construction of the Social Assessment Model for the University,G647
  17. Cloning and Expression of Novel β-Glucosidase Genes from Rhizopus Stolonifer Var. Reflexus,Q78
  18. Strain Screening of Hainanmycin Production and Fermentation Process Optimization,TQ927
  19. Mine water inrush investigation Risk Assessment,TD745
  20. The Project Management Research of Library Cataloging Outsourcing of University Library,G254.3
  21. Digital Information Resources System Security Risk Assessment,G353.1

CLC: > Industrial Technology > Building Science > Construction > Construction Management
© 2012 www.DissertationTopic.Net  Mobile