|
In recent years, Qingdao Municipal Health industry to grow, improve the physical fitness of the people played an important role for the protection of people's health. Qingdao City, in the process of promoting the construction of basic health care system with particular emphasis to strengthen health care, rational planning the layout of the town (street) hospitals obstetric strengthen obstetric construction, to protect the safety of maternal health, maternal and infant mortality level of control to continue Keep the lower level. With the rapid economic development of Qingdao City, medical treatment and care needs of the people also gradually increased. Qingdao women and children health care centers responsible for the diagnosis and treatment of the severe problems of the city's women and children, maternal and child health, disease, rehabilitation, training and guidance tasks, the center and the regions, and municipalities maternal and child health agencies, hospitals constitute the maternal and child health network for the protection of the city's 500 million women children and 80,000 per year health of newborn babies has played an important role. However, due to a serious shortage of women and children's center medical space, covers an area of ??narrow, narrow roads surrounding, resulting in many of the center's business can not be carried out, the obvious contradiction between supply and demand for medical services, queuing hospital beds in corridors, perennial phenomenon, affects and constraints of the outstanding problems of the development of the hospital. In order to better facilitate the people for medical treatment, in support of the Department of City Development and Reform Commission, Municipal Construction Committee, Municipal Planning Bureau, Qingdao women and children health care center relocation project came into being. Due to the special nature of the hospital, the project has a high investment and long payback period, the same time, the project is in the construction and operation stages facing the risk of the quality of the project, environmental pollution risk, financial risk, and a series of risks. To do this, you must do the preparatory work before the project, a careful analysis under the existing conditions, the ability to effectively overcome the lack of risk-averse. This paper first describes the background to the study, in order to explain the source of this study and its significance; Second, the article further elaborated Project Risk Management and Countermeasures Research introduced at this stage of research, research ideas and methods of treatment. Then the risk management theory based relocation project reality for women and children health care centers in Qingdao, analysis of the project's internal and external influencing factors, and risk identification, pointed out the various stages of representative types of risks : in the project feasibility study aspects of political and social risk, financial risk, program risk, duration risk; manage risk, technology risk, quality risk in the project construction aspects; link in the operation of the project is the risk of environmental impact, operators of financial risks and operational management of risk, and the use of the Analytic Hierarchy Process 8 risk analysis, draw all types of risks Relocation Project in descending order of quality and technical risk, financial risk, environmental impact risk, duration risk manage risk, the program risks, political and social risks, and other risks. Sort through the level and consistency test, considering the risk factors affecting the relocation project, project risk should take measures to an important degree of order to avoid, transfer, weakening to accept. In the last article, the focus of the feasibility study links, building links, and operational aspects of risk prevention and control problem, and propose appropriate control measures, to provide protection for the smooth implementation of the project.
|