Dissertation > Excellent graduate degree dissertation topics show

Analyses of Relationship between Advantage and Disadvantage of Dam Engineering Construction and Ecological Protection

Author: GuoXiaoZe
Tutor: MaXiaoFan;YuLianSheng
School: Jilin University
Course: Environmental Science
Keywords: Project of the dam Ecology resources Value calculating contrast of benefit and disadvantage
CLC: X322
Type: Master's thesis
Year: 2005
Downloads: 290
Quote: 1
Read: Download Dissertation

Abstract


The waterpower resourses of our country are abundant, especially the southwest, condition of offering the convenience that the water and electricity are developed. Benefit that water and electricity develop remarkable, but the ecological environment caused provides food for thought, people no longer immerse it in the short-term local interest that the dam brings, and put the eyes on comprehensive effect of ecology produced finally. Develop the rise disputed with Nujiang, cause people’s more objective treating this question. Lancang River water and electricity develop pros and cons quantize research subject whether State Environmental Protection Head Bureau environmental project assess centre self-raised subject ", this thesis was finished on the basis that " the power station environmental resources value in Jinghong is checked and calculated and studied " for the sub subject of this subject by author. Analyse the ecological environment question developed in dam from ecology, environmental science, ecological economics, angle of environmental economics in thesis, quantization ecological environmental resources value, differentiate the rationality of engineering construction and feasibility of the environment. This text divides five chapters altogether: First, introduce people new knowledge to the dam emphatically. But with the awakening of human environmental awareness and birth of the sustainable idea of development, after the ones that have gone through the dam correctly have paid homage to, worldwide, people began to examine a series of questions brought in dam closely and review again at last. It is exactly because of building the negative social and environmental question caused in dam, make people hold more and more suspicion attitudes to the dam, people no longer immerse in the short-term local interest that the dam brings, and put the eyes on comprehensive effect of ecology produced finally. Mention from bar hold the first world when the conference of the dam in storehouse of Brazil from 1997, the dam committee of the world is determined as the world against dam day on March 14 annual. Remove those ones that wear out and dam with the serious problem, resume the natural, lively river, have already become a kind of new trend, have indicated the arrival of times of the policy of the dam of changing. Second, I have estimated to the value of the environmental resources. Ecological environmental resources value is formed by two kinds of value of different nature, so adopt the vector quantity adding and method. In the type: A is the use value, depend on the utility of the environmental resources , restricts A to the utility showing with mankind’s life and production in most close relations here, decide by market supply and demand , can check and calculate the law of market value . B is decided by loss caused in destruction of the ecological environment in order to compensate value. Because environmental resources have many kinds of function, must consider many value its lose. For instance the forest reserves, it destroys resulting in conserving waterand soil, the source of supply of oxygen, forfeiture improving such functions as the office ground climate, etc... Lose value can is it resume law , law of expenses and project of shade , protect expenses law method is it check and calculate to go on to adopt. What the value of the environmental resources reflected is the relation between a kind of person and environmental resources, the corresponding environmental resources have timeliness , rareness and social attribute ,etc.. So, value reflects the ecological environmental resources vary with time , place and social environment. Available density of population, abundant degree and per capita national income of environmental resources change of index is it say to come. The density of population reflects the demand level of the environmental resources, but delivery volume that abundant degree of the environmental resources reflects environmental resources, the per capita national income reflects the relation between the value of the environmental resources and economic development level. In the type, D1, D2 …Dn is the rate of change of annual border of index n. 3rd, have got the relation analytical method of pros and cons out of and established the system of index. Economic to carry on overall value analyse with ecological environmental impact society to whom irrigation works develop have. Economic and ecological environmental impact of society of the irrigation works including two parts, first , expenses andbenefit , second , between irrigation works and loss compensation should paid that ecological environment cause , project of itself. To to economic to carry on overall value check and calculate with ecological environmental impact society have irrigation works, it is on the basis of overall comprehensive society , economic and environmental benefit and environmental cost, probe into the feasibility of engineering construction of water conservancy. Make use of feasible index of ecological environmental impact to probe into the feasibility of engineering construction, the formula is as follows: …In the type: It is ecological environmental impact feasible for index, lose value always by project value and ecological environment not overall than, when ≥is at 1 o’clock, this project is feasible, acts as <1, the project is not feasible; It is the use value of the project, satisfied with the deciding usefully of demands of people by this project, it is a total benefit minus capital construction investment of the project of the project, namely NPV (require NPV> 0 here, the feasible scheme in namely the foundation of the project is analysed). Compensation value of project, namely project this for pollution ecological loss actual advance expenses (most projects are not considered at present, real B =0); E Lose the current value for the value of the ecological environmental resources. As A>EC, can 0 in principle, compensate, but project is it is it is it make financial benefit of project this reduce to compensate to go on to influence to environmental outside; And at A 0. As one o’clock such as

Related Dissertations

  1. Research on Ecology Resources’ Value Compensation Mechanism,X321
  2. The Model of Dam Type Optimum Selection and Its Application Study on Hydro-junction Project,TV64
  3. The Research of Ecology Tax Revenue Theory and System in Our Country,F812.42
  4. Seepage control scheme of NiErJi Engineering and Construction Technology Research,TV223.4
  5. Study on Junction State of Fresh-old Concrete and Safety Evaluation for Heightening Project of Danjiangkou Dam,TV544
  6. Northwest Geological two lead and zinc in the river Construction of QHSE management system,X936;X322
  7. Study on Ecosystem Risk Management of Coal Mine Based on Fuzzy Cognitive-map and Stakeholders’ Participation,X322
  8. Jinan City Low Carbon Traffic Construction Discussed,X322
  9. The Research on Environmental Protection of ShenHua & Tianjin Coal Terminal Ⅱ,X322
  10. Research on Environmental Monitoring of Polluting Industry in Zhuhai,X322
  11. The Legal Thought of Ecologic Restoration of Mining Disposal Site in Hebei Province,X322
  12. The Energy-saving and Pollution-reduction for Cotton Dyeing Industry,F206;X322
  13. Contractor HSE Management of African Petroleum Operational Project,X322;X937
  14. Study on the Implementation Method and Technique of Cleaner Production in Gold Mine Enterprise,X322
  15. The Research on Accounting Environmental Contamination and Improvement in Coal Mine Enterprise,X322
  16. Study on the Mining Group Circular Economy Mode 0f Fuxin,X322
  17. Study on Evaluation for Energy Conservation and Emission Reduction in Chinese Ports,X322
  18. Evaluation of the level of the building of a resource-saving and environment-friendly enterprises,F425;X322
  19. The Research in HSE Management System Implementation of JXSH Project Company,X937;X322
  20. Study on Ecological Protection Craft during Highway Construction,X322
  21. The Study on Evaluating System and Evaluating Method about Green Construction,X322

CLC: > Environmental science, safety science > Administration of Environmental Protection > Environmental planning and environmental management > Sectoral environmental planning and management
© 2012 www.DissertationTopic.Net  Mobile