Dissertation > Excellent graduate degree dissertation topics show

Bus fire safety protection system development project schedule analysis

Author: HuangYong
Tutor: ChenGuangYu;SongXiaoYong
School: University of Electronic Science and Technology
Course: Project Management
Keywords: Bus fire safety protection Progress control Progress management
CLC: D631.6
Type: Master's thesis
Year: 2010
Downloads: 58
Quote: 0
Read: Download Dissertation

Abstract


With the social and economic development, the long-term work and overload operation of bus passenger vehicles have made safety problems of bus passenger transportation becoming more and more serious. Therefore, it is extremely urgent to develop a safe transportation system. However, the previous development processes couldn’t meet the needs of the new system, so that the advanced project management methods should be used to improve the ability of efficiency of project management, the ability of progress control and so on.The study is aim to draw up the time schedule, control the process and methods, with the development projects of Chengdu bus fire protection system as the object of study. According to requirement of time limit, our study also analyzes the work and logic of the project. Besides, we used Project management software to compile development programme, based on milestone plan. In the project, the relationships among various relative factors need to be harmonized, and all the possible methods and measures can be applied. Meanwhile, both safety and quality control should be considered, in order to complete the schedule objectives and ensure the progress to be come.The development project of fire protection system is strong emergency and unpredictable. Some factors which have negative effect to the project must be emerged, which make the rate of progress couldn’t be carried out as established program. However, the deviation between the plan and the actual progress can be controlled through dynamic monitoring and tracking, by using PDCA circulation method. In terms of the different situation, we take diverse regulatory measures, and then adjust and renew the project, timely, so that we can control and manage the project scheduling, effectively.Overall, our study analyzes the scheduled plan of bus fire protection system and get the experiences in order to provide the useful schedule control experiences to the follow-up protection system development projects.

Related Dissertations

  1. Heping District Library project agent system implementation phase of the project management optimization studies,G251
  2. A project Material Management System Design and Implementation,TP311.52
  3. Suzhou Science and Technology Building Project Scheduling and Control,TU722
  4. The Research on the Progress Controlling of the Residential Areas Planning and Design Project,TU984.12
  5. The Study of Schedule Management and Risk Management in the Construction of Repeater Project,F626
  6. Based on real-time monitoring of high core rockfill dam construction simulation and scheduling control,TV511
  7. The Evaluation and Control of the Comprehensive Progress for Large-scale Project,F284
  8. Scheduling Management of Aniline Project of DX Construction Company of SINOPEC,F426.72
  9. Sichuan-Tibet highway expansion project Wuhou segment and control the progress of the plan,U418.8
  10. Owner project management implementation,F284
  11. Project planning and progress control in a semiconductor enterprise applications,F407.6
  12. Technology Project Performance Management Research,G311
  13. Highway construction project environmental management system research,X322
  14. P3 Ning electrical engineering schedule management,F426.61
  15. ZZ -rise residential building construction phase of the project schedule management research,F284
  16. Research on Progress Control of Large-scale Metallurgical Construction Project,F426.3
  17. Study on Schedule Control of STXY Landscape Project,TU722
  18. Critical Chain Based on Fuzzy Theory Study schedule management,F272
  19. Earned Value Method Based on Critical Chain project schedule and cost integrated control study,F285
  20. Control modes and mechanisms based on the progress of the construction project of the supply chain management thinking,F274
  21. Earned Value Method in waterfront residential project cost schedule control Application Research,F285

CLC: > Political, legal > China's political > State administration > Public security work > The fire service
© 2012 www.DissertationTopic.Net  Mobile