Research on Construction Project Cost Control of the Third Project Department of XX City Municipal Corporation

Author: AnYongFang
Tutor: AnLiRen
School: Northwestern University
Course: Business Administration
Keywords: Construction Project Cost Control Contracting system
CLC: F426.92
Type: Master's thesis
Year: 2006
Downloads: 454
Quote: 2
Read: Download Dissertation

Abstract


With the further development of China's market economy and the country gradually strengthen the construction management of tangible and intangible market, construction increasingly fierce competition among enterprises, they face the external and internal environment is also undergoing dramatic changes. Each construction enterprise as an autonomous, self-financing economic entities, are faced with how to deepen the internal reform of enterprises to change their operating mechanism, establish a scientific and rational management system issues. The establishment of a scientific and rational, market-oriented management system the key is how to manage and control the cost of business as a core part of the task. Municipal Corporation, the city is located in the forefront of reform and opening up, the construction industry at this stage at a low level over the competitive environment, the third project department how to cost control as the core, the cost to be effective, is the purpose of this study lies. Thesis project cost control theory, from the third project department external constraints and the current situation of internal cost control, examines some of the projects of the construction process, the final design suitable for the actual situation of the third project department cost control programs. Proposed the establishment of cost management and control system, the development of cost control management, timely analysis and cost assessment costing this refined clear cost control processes. This article points out, optimize the construction program, in-depth research project design documents and construction conditions specific to draw on the prevention of runaway costs of the measures to eliminate congenital lack of cost control efforts, so that \purpose; while the construction process, cost control, cost control is the focus of the work is difficult, therefore, should be timely and cost accounting and cost analysis investigated the situation, if found error, then take organizational measures, technical measures, economic measures to corrected, cost control within a predetermined target range; afterwards for the next phase control is mainly cost control efforts suggest improvements and provide the basis for the cost assessment. In this paper, the process of writing the Ministry of the third project cost control work done field research papers practicality stronger, and its conclusions on the Ministry of Municipal Corporation's other projects have reference significance to the implementation of the contract system of construction project organization cost control efforts also have reference.

Related Dissertations

  1. Study on the Internal Control Issues of Highway Construction Investments,F540.34
  2. Research on Construction Accident Factors’ Interaction Relations,TU714
  3. Vocational Training Base Construction Project Cost Control,G712.4
  4. JF company \,F426.72
  5. Construction project environmental impact assessment of public participation in the \,X820.3
  6. DB logistics company operating system problems and countermeasures,F259.23
  7. Research on the Feasibility of Highway Construction Project,F542
  8. Research on Manufacturing Cost Control Strategy for Sichuan BS Company,F426.6
  9. Study of the Cost and Cost Control of Venous Industey in Coal Mining Area,F406.72
  10. Research of Motivation Scheme Based on Cost Control,F272.92
  11. Quality Cost Control Research Based on Marine Charge Air Cooler Enterprise,F275.3
  12. Change the Z Project Cost Control Research,F285
  13. The XY company cost control analysis,F426.8
  14. 3G base station access project cost control and management,F626.116
  15. A class of uncertain linear discrete delay singularly perturbed systems Guaranteed Cost Robust Control and Research,TP13
  16. For innovative enterprises quality cost control and optimization studies,F273.2
  17. Auto Production Line Project Cost Management,U468
  18. Earned Value Analysis in infrastructure projects, private colleges in the application of cost control,G648.7
  19. The Real Estate Project Prior-Cost Control Study,F293.33
  20. Study on Displaying Implicit Cost in Construction Project,F285
  21. Research on Cost Control Technology for Design Phase of Motorcar Product,U462

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile