Dissertation > Excellent graduate degree dissertation topics show
Study on Construction Process Control Model of Housing Project
Author: WeiJian
Tutor: ZhouJian
School: Zhejiang University
Course: Architecture and Civil Engineering
Keywords: Residential Quality Process Control Analytic Hierarchy Process Fuzzy Comprehensive Evaluation
CLC: TU721
Type: Master's thesis
Year: 2005
Downloads: 269
Quote: 0
Read: Download Dissertation
Abstract
|
With the gradual commercialization of residential , people put forward higher requirements for the quality of the residential . But is not optimistic at this stage , the overall quality status of the residential , residential quality high complaint rate . This requires the construction projects in the residential project to strengthen the management of the construction phase of the subject in the residential construction process to ensure the quality of residential projects . This article proposes a residential development of the construction phase of the project management mode . This mode is for the three main objectives of the construction phase of the implementation of process control quality, schedule , cost control , and security and civilized production . Its purpose is to fundamentally eliminate the irregularities and supervision of the construction unit personnel as behavior . This paper first analyzes the present, China's residential supervision management and the status quo of the residential building construction team , pointed out that in this stage , supervision and quality of the construction unit is inadequate to the effective control of the residential construction process of the three main objectives of safe and civilized production . On this basis , the proposed residential development enterprise process control is necessary for the construction phase . Subsequently , the article introduces the development of residential construction management theory . With an example, then the concept of process control and process control management measures described . Analyzes the tripartite relationship between the owners in process control , supervision and construction unit to establish an index system , a comprehensive evaluation of the construction process and construction units . Finally, using the analytic hierarchy process and fuzzy math , fuzzy comprehensive evaluation theory , a comprehensive evaluation to establish the evaluation index system of the construction process of the construction unit , with an engineering example illustrates the evaluation process . With this evaluation system , effective supervision and control of behavior throughout the construction phase of the construction unit .
|
Related Dissertations
- Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
- Research on Index System and Evaluation of University Office Greening,G647
- The Study on Risk Evaluation of BOT Projects in China University,G647
- Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
- The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
- Research and Design of One Kind of Paper’s QCS That Based on Embedded System,TP368.1
- The Research on Evaluation Method of Highway Ecosystem Healthy,X826
- Prospecting and evaluation of the initial stage of the value of the elements of the analytic hierarchy process and fuzzy comprehensive evaluation model,F426.1
- Evaluation on Stability of Threshing and Redrying Lamina Structure of Tobacco,TS443
- A Comprehensive Evaluation of Heritage Trees,S788
- Studies on Urban Characteristic Culture and Construction of Urban Landscape,S731.2
- An Exploration of the Performance Assessment of the College Counselor,G641
- Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
- On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
- A Control Chart for Simultaneously Monitoring the Time Interval and Size of an Event,X924
- Study on the Evaluation Method of Flue-cured Tobacco Sensory Characters,S572
- Social insurance agencies risk prevention research,F842.6
- Cost Control of government statistical work,C829.2
- Research on Capital Management in Current Chinese Universities,G647.5
- Research on Evaluation of Coal Enterprise Energy-Saving Mechanism,F206
- The Product Quality Improvement Study Based on SPC and DMAIC,F224
CLC: > Industrial Technology > Building Science > Construction > Construction organizations and programs > Construction organization
© 2012 www.DissertationTopic.Net Mobile
|