Construction Control Technique for High-Pier and Long-Span Continuous Rigid-Frame Bridges based on ANN
Author: XuYin
Tutor: XuYue;WangChunSheng
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: Continuous Rigid Frame Bridge Construction Control Neural Networks Grey Relational Analysis Principal Component Analysis
CLC: U445.1
Type: Master's thesis
Year: 2005
Downloads: 220
Quote: 3
Read: Download Dissertation
Abstract
|
In recent years , high pier and long span continuous rigid frame bridge with its driving smooth and comfortable , ease of construction , is conducive to the maintenance and other advantages are increasingly built to promote the theory of bridge design , construction techniques and the development of the construction control method . However, the bridge construction control method in a way is a lag in bridge design theory and construction technology , control theory immature monitor backward technology and other factors limit the development of bridge construction control technology and breakthroughs . Artificial neural network method was applied to the bridge construction control technology as the bridge workers , bridge construction control provides a useful reference and ideas . This method is still in the theoretical discussion and projects for the trial stage , there are still many problems to be solved . Thesis entry point , trying to solve the artificial neural network is applied to some of the problems encountered in the bridge construction control , thereby enriching and improving the existing bridge construction control technology . Bridge workers in this application of artificial neural network to bridge construction control to select the input , output vector with considerable arbitrariness and experience component . Bridge construction control characteristics , the paper analyzes the many factors that cause elevation error of linear control , the introduction of a \the number of neurons in the input layer structure , reasonable and completeness , either consider various error factors in a more comprehensive manner and achieve the independent input of each vector , the purpose of reducing the number of dimensions and the network size . The paper will also examine the application of the results to the linear control of Xu ditch Bridge , better stage , and - span continuous rigid frame bridge construction control the temperature of the complex impact of ultra-high pier the long cantilever temperature correction method .
|
Related Dissertations
- Application of Improved Principal Component Analysis Algorithm in Course Construction,G642.4
- Research on Anti-periodic Solutions of Delayed Cellular Neural Networks without Assuming Global Lipschitz Conditions,TP183
- Designs and Applications of Fuzzy Synthetic Evaluation Models Based on Parallel Algorithms,TP18
- Research of Diagnosing Cucumber Diseases Based on Hyperspectral Imaging,S436.421
- Zhaoguan Lower Coal Group water inrush prediction and control techniques,TD745
- Prediction of Binding Affinity of Human Transporter Associated with Antigen Processing,R392.1
- Multi- license plate location method based on CNN's Intelligent Transportation Systems Research,TP391.41
- Research on Feature Extraction, Selection and Classification Algorithms for Pulmonary CAD,TP391.41
- Research of QoS Optimization Based on Neural Network Prediction for Ethernet Passive Optical Network,TN929.1
- Research Onamethod for Human Face Recognition Based on MMTD,TP391.41
- The Research of E-government System Performance Evaluation Index System in Linyi City Based on the Principal Component Analysis,G206
- Study on F Company’s Marine Cable Distribution Mode,F426.474
- Fault Diagnosis on Fuel Control System of a Certain Aero-engine,V263.6
- A project supervision model of multi-project management company,F284
- Passive analysis of the types of neural networks with delay,TP13
- Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
- Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
- The Construction Control for PC Continuous Beam Bridge,U445.4
- Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
- Missing Data Imputation in Bridge Health Monitoring System Base on Hybrid Model of SARIMA and Neural Network,TP183
- Classification of Customer Value Based on Rough Sets - Neural Network,F224
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction organization and management
© 2012 www.DissertationTopic.Net Mobile
|