Dissertation > Excellent graduate degree dissertation topics show
Gray system theory - based cable saddle without pre- partial suspension bridge superstructure construction control study
Author: LiJianNing
Tutor: LiuLaiJun
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: Suspension Bridge No cable saddle pre- partial construction Grey System Theory Construction Control The main tower deviation The基准索Share Concrete elastic stress Cable force
CLC: U445
Type: Master's thesis
Year: 2005
Downloads: 113
Quote: 0
Read: Download Dissertation
Abstract
|
Basis the cable saddle without pre- bias construction of the suspension bridge construction sequence , the main content of the Lancang River suspension bridge superstructure construction control study was to investigate , and to be applied in engineering practice . Linear adjustment for the Ji Zhunsuo Share erection during use of the analytic iterative method for linear adjustment , given operable Adjustment Cable . Based on the basic theory of gray system , in the main cable erection period , in the use of the sensor temperature measurement errors caused by wire length correction ; in stiffening girder hoisting construction period , according to the construction characteristics of the Lancang River suspension bridge , application of gray system theory, the use of the construction phase of the main tower deviation of the measured data , multi-step prediction of the main tower deviation better grasp the correction tension opportunity to guide the construction . This article also strain meter stress measurement in concrete structures commonly used in embedded steel strings , improved analysis of the main tower of concrete Sarasota contraction , creep effective way to provide a reliable guarantee for the Sarasota real stress .
|
Related Dissertations
- Studies on Key Planting Skills of Cigar-Wrapper Tabacco,S572
- Technology Research on the Cable Replacement of Prestressed Concrete Cable-stayed Bridge,U448.27
- FBG -based cable force sensors Development and Application,TU317
- A project supervision model of multi-project management company,F284
- Interior decoration of formaldehyde in air pollution after detection, analysis and control,X831
- Leaning Type the arch bridges reasonable into bridge cable force and construction phase Cable Forces,U441
- North Jiangqiao Cheng bridge and construction process force performance analysis,U448.27
- Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
- Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
- The Construction Control for PC Continuous Beam Bridge,U445.4
- Structure Design and Monitoring about Double Inclined Pylon Partial Cable-stayed Bridge Without Back-stays,U448.27
- Study on Reasonable Design States and Dynamic Characteristics of Extradosed Cable-stayed Bridges,U448.27
- Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
- Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
- Study on Concrete Creep Theory Applied in Construction of Continuous Rigid Frame Bridge,U445.57
- Research on Prestressed Concrete Continuous Rigid-frame Bridge Construction Control and Fold Technology,U445.4
- Chinese FDI quality research,F832.6
- Based on Grey System Theory preliminary risk assessment of construction projects,F224
- Suspension Bridge Steel Pylon Conveying Limestone about Wind Resistance,U448.25
- Self-anchored suspension bridge with single tower structure parameters of,U448.25
- The Stable Type Suspension Bridge Reinforced Concrete Slab Strengthen Beam Optimizing Research,U448.25
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction
© 2012 www.DissertationTopic.Net Mobile
|