Steel hinge line parallel cable-stayed bridge construction control study
Author: JiangYuGang
Tutor: HuangPingMing;SunShengJiang
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: P.C. cable-stayed bridge Construction Control Steel hinge line parallel cable Cable force
CLC: U445.4
Type: Master's thesis
Year: 2005
Downloads: 162
Quote: 2
Read: Download Dissertation
Abstract
|
In this paper, five estuary bridge engineering background , the PC cable-stayed bridge construction control of the whole process especially steel hinge line parallel to the cable control cable force carried out a detailed study . Through a variety of cable-stayed bridge construction control methods are compared , elaborated on the contents of the cable-stayed bridge construction monitoring . Through the cable vibration equation derivation , instead of the quadratic parabola catenary was proposed based on considering the cable sag , bending stiffness, boundary conditions and the slope of the cable vibration equation and made Elah cable vibration equation -based cable force test practical formula. The steel hinge line parallel cable and parallel wire cable comparison , a set of parallel steel hinge line for cable tension measurement method, and applied to five estuary bridge construction control is better.
|
Related Dissertations
- Technology Research on the Cable Replacement of Prestressed Concrete Cable-stayed Bridge,U448.27
- FBG -based cable force sensors Development and Application,TU317
- A project supervision model of multi-project management company,F284
- Leaning Type the arch bridges reasonable into bridge cable force and construction phase Cable Forces,U441
- North Jiangqiao Cheng bridge and construction process force performance analysis,U448.27
- Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
- Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
- The Construction Control for PC Continuous Beam Bridge,U445.4
- Structure Design and Monitoring about Double Inclined Pylon Partial Cable-stayed Bridge Without Back-stays,U448.27
- Study on Reasonable Design States and Dynamic Characteristics of Extradosed Cable-stayed Bridges,U448.27
- Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
- Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
- Study on Concrete Creep Theory Applied in Construction of Continuous Rigid Frame Bridge,U445.57
- Research on Prestressed Concrete Continuous Rigid-frame Bridge Construction Control and Fold Technology,U445.4
- The Construction Control Research on the Long-span Continuous Rigid Frame Bridge,U445.4
- Research on the Key Technologies of Reinforcement of Dilapidated Arch Bridge with Suspender,U445.72
- Cantilever Casting Construction Technology of Yanghe Bridge,U445.466
- Construction Stress Analysis and Control of Long-span Arch Bridge,U448.22
- RHEDA 2000 track in the form of ride comfort control method,U213.2
- Construction Control of Moveable Steel-Box Bridge,U445.4
- The Key Techniques for the Construction of Jinan Yellow River Bridge on Qingdao-Yinchuan Highway,U445.4
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology
© 2012 www.DissertationTopic.Net Mobile
|