Dissertation > Excellent graduate degree dissertation topics show

The projector performance test system and the test method

Author: ZhaoHuiFang
Tutor: LiuXiangDong;LiHaiFeng
School: Zhejiang University
Course: Optical Engineering
Keywords: Projector Performance indicators Photometry Color Meter
CLC: TS951.76
Type: Master's thesis
Year: 2006
Downloads: 207
Quote: 1
Read: Download Dissertation

Abstract


Since the projection display plays an increasingly important role in various fields , from manufacturing cost and easy-to-use point of view , the projection display is spread at an alarming rate in people 's lives . With the improved quality of life , people are more and more on the performance requirements of the projector , which also resulted in a the projector performance test links become a particularly important step in the production process of the projector . This thesis is focused on tests and test methods of projection display performance improvements initiated . The main projection display the status quo and development of the industry in the first part of this article . Four projection projector display technologies - LCD , DLP , LCoS and GLV comparison; introduced and explained as well as the performance of the projector , and detailed the projector performance test method , a special presentation specifications of the American National Standard ANSI-1997 test method projection display . Comparison of China, Japan and the United States , the difference in the the projector performance test methods and superiority . The proposed set of projector performance automatic test system for the second part of this article , the system uses color illuminance meter as a detector , detector stepper motor driven scanning probe in the two-dimensional projection plane . The system can scan the projection surface , with a positioning accuracy , high accuracy, high speed , easy operation , etc. . In this paper, the use of automatic test system to test a large number of projectors analysis , there is a certain degree of error found that current testing methods . The spirit of looking for the easy to operate , and the authenticity of the projector closer to the principle of energy , this paper has made ??some improvements on the test methods , major improvement DLP projector flux, contrast , illumination uniformity and chroma uniformity test method , proposed separately luminous flux testing Act 4:00 , 4:00 contrast test , 5:00 ( 0.9 FOV ) Act, illumination uniformity and chroma uniformity test method . Confirmed by a large number of experimental test , performance test the feasibility and reliability of the improved method . Part in the third part. Finally, the research topic , a summary of the work , and pointed out a new direction .

Related Dissertations

  1. Construction of G Bank Yunnan Branch Office of Performance Management System,F272.92
  2. HJ Logistics Performance Management,F259.23
  3. Dynamic Network Systems Research and Development of Embedded Controller,TP393.06
  4. Galaxy built of Group Human Resources Performance Appraisal System Design and Implementation,F272.92
  5. Corporate culture match the impact of cross-border M \u0026 A performance study,F270;F224
  6. The System Design of Performance Appraisal for the Project Department of JXHE Company,F426.61
  7. Performance Evaluation of Transmission Line Based on SCADA,TM76
  8. Study of Substation Operating Performance Evaluation Based on SCADA,TM63
  9. Research and Application on the Performance Model of Combined Cycle Unit,TM611.3
  10. Air transport enterprise KPI performance appraisal system,F562.6
  11. Research of HN Academy of Building Research Staff Performance Appraisal System,F426.92
  12. Research and Application of OTTV in the Cold Winter and Hot Summer Region,TU831
  13. A Study on Construction and Implementation of Enterprise Performance Management System,F272
  14. Study of the High-tech Enterprises Governance and Business Performance Evaluation Index and Selection Based on the Multi-level Principal-agency Theory,F276.44
  15. A Coal and Electricity Group electromechanical company build enterprise strategy management system based on the balanced,F426.61
  16. Research on Project Management in Toyota Technical Education Program,F426.471
  17. Performance Evaluation Study of District Business Department of Yulin Mobile Company,F626
  18. Research of the Performance Evaluation of Changqing Fracturing Branch Employer Based on the KPI,F272.92
  19. The Study on Performance Evaluation of Top Management Team,F272.92
  20. Research on Performance Management of Harbin Vehicles Service Company,F272
  21. Study on Main Influencing Factors of China’s Stock Prices with Application of Real Estate,F832.51

CLC: > Industrial Technology > Light industry,handicrafts > Other light industry,handicrafts > Stationery manufacturing industry > Teaching aids > Projector
© 2012 www.DissertationTopic.Net  Mobile