Dissertation 

About 76 item dissertation in line with time optimization query results,the following is 1 to 50(Search took 0.070 seconds)

  1. Research on an Evaluation Model for Topology Partitioning Based on Network Simulation,GeWenTang/Harbin Institute of Technology,0/15
  2. Study on construction project time management in X hotel renovation project as an example,QuanTianWu/Kunming University of Science and Technology,0/22
  3. Real-time Optimization and Control of Batch Processes,YangGuoJun/South China University of Technology,0/93
  4. Research on Time Management of SMEs Park Regulatory Control Preparation,ZuoChunSheng/Chinese Geology University (Beijing),0/20
  5. A Study of the Scan Time of Neoplastic Lesions in the Liver by64-slice Spiral CT Angiography and the Clinical Application,ZhuHao/Lanzhou University,0/12
  6. Research on the Real-time Optimization of Integrated Delivery Vehicle Routing for Household Appliances Both Forward Logistics and Reverse Logistics,XuYun/Nanjing Forestry University,0/1
  7. Modeling of Metro System and Timetable Optimization for Energy Conservation,YangYang/Shanghai Jiaotong University,0/72
  8. Research and Practice of Optimizing the Management of Railway Freight Utilization,GuanXiaoJun/Southwest Jiaotong University,0/7
  9. Study on Energy Management Strategy and Parameter Matching of Parallel Hybrid Construction Machinery,JingYongLi/Jilin University,0/161
  10. Real Time Optimization System Rebuilding and Model Study of Low-Temperature Styrene and Butadiene Emulsion Polymerization,TianWenDe/Beijing University of Chemical Technology,1/245
  11. Study on Numerical Simulation of Basic Process and Real-time Optimizing of Deep Foundation Pit,ShenXiZhong/Wuhan University,27/1538
  12. The Research on New Methods of the Planning Management of Uncertainty Engineering Projects,NiuDongXiao/North China Electric Power University,8/1292
  13. Study of Optimum-Design Theory and Dynamic Displacement-Controlling of Deep Excavation,XuYangQing/Wuhan University of Technology,25/1745
  14. Mnemonic Enhancement Optimization for Process Systems,FangXueYi/Zhejiang University,0/108
  15. Study on the Optimization of Evacuation Routing Measures in View of Traffic Management and Control,GaoMingXia/Tianjin University,3/430
  16. A Study on Resource Consolidation Decision of Logistics Service Integrator under Supply Chain Enviroment,WangXiaoLi/Huazhong University of Science and Technology,0/401
  17. Modelling and Real-time Algorithm on Energy-Efficient Operation for Freight Train with Diesel Locomotive,BaiZuo/Beijing Jiaotong University,0/148
  18. Study on Advanced Process Control Technology Based on Model Predictive Control,AnAiMin/Lanzhou University of Technology,0/138
  19. The Time Estimation and Optimization of Product Development Process in the Quick Response Manufacturing System,ZhangKunLun/National University of Defense Science and Technology,0/15
  20. Time Optimization and Control of X Workshop Construction Project,WangSheng/Chinese Geology University (Beijing),0/252
  21. FATTY: for embedded devices FAT file system implementation and optimization,LiuKeJia/Shanghai Jiaotong University,3/185
  22. Study on the Optimization of the Efficiency of Automated Storage/Retrieval System,LiuHui/Liaoning Technical University,5/306
  23. New Roof production water for the comprehensive management of project management practices,ZhengJianYong/Nanjing University of Technology and Engineering,1/106
  24. The Research of Grid Resource Management and Scheduling Algorithm,QiJingJing/Wuhan University of Technology,1/226
  25. Study on Agent-Based Approach of Project Schedule Management,ZhaoShuHong/Hebei University of Technology,2/262
  26. Process Management of a Research Project of a Chunxi Road Market,ZhongYiMing/Southwest Jiaotong University,1/229
  27. Study on 3-D Turbulent Numerical Simulation on Airflow and Optimal Design of Greenhouse,CaoYang/Yangzhou University,2/102
  28. Data Processing and Real-time Optimization of Acetaldehyde Production Process,WangJinLin/Zhejiang University,1/223
  29. The Inventory Management of Guizhou Hongfu Ammonia-Phosphate from the Supply Chain Management Perspective,HeGuangLiang/Sichuan University,0/145
  30. Optimization Study on Maintenance Resources Based on Equipment Reliability,LiJianMing/Shanghai Jiaotong University,6/498
  31. Real-time Optional System for Vehicle Scheduling of Logistics Distribution,GuanShiPing/Chongqing University,4/569
  32. Research of Grid Task Scheduling Algorithms on Computational Economy,ZhuLuMei/Hunan University,5/142
  33. Research on Yard Gate System on Container Terminals Based on Simulation Optimization Method,YuYue/Dalian University of Technology,6/274
  34. Vincent River Cascade Hydropower Station Economic Dispatch,YinZiYuan/Sichuan University,0/245
  35. Research and Implementation of the ITU-T G.729A speech coding algorithm,CuiXinFa/University of Electronic Science and Technology,4/273
  36. Godson-2 Link Time Optimizer Implementation and Analysis,ChenZuo/Institute of Computing Technology,0/61
  37. Research on Optimization of Decision Network Planning Based on Fuzzy Theory,ShiYong/Hefei University of Technology,3/259
  38. Research on Time Optimization for Mass Assembly Customization,HuangLiPing/Xi'an University of Technology,5/177
  39. Research on the Real-time Optimal Dispitch Scheme for Voltage and Reactive Power in Area Network,SongDi/North China Electric Power University (Beijing),2/239
  40. The Research of Grid Resource Scheduling Algorithm Based on GridSim Toolkit,LiuYiMeng/Sichuan University,21/548
  41. PREDICTIVE CONTROL OF AN ETHYLENE OXIDE REACTOR ON NEURAL NET-BASED MODEL,WangYueLong/Northwestern Polytechnical University,1/109
  42. Asphalt concrete pavement construction machinery rational selection and optimization of fleet,YangYi/Chang'an University,1/148
  43. Implementation and Application of a Novel Real-time Optimization Framework,ZhouZhou/Zhejiang University,0/80
  44. Research on Key Technologies of CAE System for Injection Molding,ChenLu/Huazhong University of Science and Technology,1/95
  45. Research on Time Optimization of Mass Customization for Furniture Business,ZhouJiNa/Harbin University of Science and Technology,2/184
  46. Study on Inventory Circle Time Optimizing and Performance Appraisal of Shipbuilding Supply Chain,LiuBaoWei/Dalian Maritime University,1/192
  47. A Study on Optimizing the Construction Project Schedule Time under Uncertainty Duration,ChenErJi/Jilin University,2/160
  48. Real-time Prediction and Optimization of Operating Scenarios on PTA Oxidation Process,JiangPengFei/Zhejiang University,2/59
  49. Development of High Temperture and Dehumidification System for Integrated Circuit,FengYuKai/Shanghai Jiaotong University,0/45
  50. Time Control of Rearrangement Program of People.com’s Olympic Channel,ZhangRui/Chinese Geology University (Beijing),0/74

Total 2 Pages First Previous 1 2 Next Last

© 2012 www.DissertationTopic.Net  Mobile