Dissertation > Excellent graduate degree dissertation topics show

Studies on the System of Construction Project Integration Management and Its Performance Evaluation

Author: GuoYong
Tutor: ZuoWenZhou
School: Xi'an University of Architecture and Technology
Course: Management Science and Engineering
Keywords: construction project integration management performance evaluation BP nerve network Control index
CLC: F284
Type: Master's thesis
Year: 2006
Downloads: 645
Quote: 9
Read: Download Dissertation

Abstract


Project management means "the usage specialized knowledge, technical ability, tool and the method in the project activity, can make the project realize or exceed the person’s demand who contact with the project. It can be divided to nine realms in the management of the construction management: The scope manages, time management, cost management, quality management, labor management, communication management, purchase management, risk management and whole management. Among them, date, cost and quality are the core of project management. The construction is the important stage to convert the design into entity .But the studies on project management of our country now mainly focus on the analysis of single factors, which lack of the system analysis. Therefore it is important to make some study on the system of construction project integration management.This paper carries out the concept of construction project integration management after the analysis integrates, integrate meaning and integration management, and give a detail of the concept. That system includes the integrated planned establishment of the project and plan controlling of integration management. In the performance appraisal of construction integration management this paper make a study on the neural network;it performs the possibility of using it .And research on the simple index such as date, quality and cost. Finally it builds a BP nerve network model on the performance evaluation of construction integration management. At last, we can use an example to prove the usefulness of the BP neural network.This paper has done some research on the concept analysis of construction project integration management and the plan and control of it. It makes some study on the application of BP nerve network method in the field of construction project integrationmanagement. It pursues the good management effect of the project and pushes the effective controlling of construction project integration management forward.

Related Dissertations

  1. The Research on the Performance Results Application of Zhaoqing Power Supply Bureau,F272.92
  2. The Study of the Performance Evaluation about the Primary Teacher in the U.S.A.,G637
  3. Performance Evaluation of University Academic Team Based on Balanced Scorecard,G647
  4. Performance Evaluation System Optimization Design of the Extend the Yan Chang Oil Industry and Co., LTD,F272.92
  5. The Reseach of Performance Evaluation of Local Government Urban Construction,D625
  6. Research on Construction of the County Government Evaluation System,D630
  7. Building the Performance Appraisal System for the Economic Cooperation and Service Bureau of XiGu District Lanzhou City,F127
  8. Study on the Public Satisfaction and Empirical Result of Jiangme Governmnet 2010,D630
  9. Research on Government Performance Evaluation System Based on "Citizenship-orentation",D630
  10. Sensitivity and Spatial Resolution of an Application-adaptive Small Animal PET,R310
  11. The Problems and Improved Countermeasures of Performance Evaluation System in Our Local Government,D630
  12. Research on Government Procurement Performance Evaluation Based on BSC,F812.45
  13. China Unicom HN Province Branch Marketing Channel Performance Evaluation and Promotion,F626
  14. Research on Strategic Performance Evaluation of High-tech Enterprises Based on BSC-AHP,F224
  15. Research on Solutions of Applying EVA Performance Evaluation System into Local Grid Corporate,F406.72
  16. Zhengzhou YT staff performance appraisal research,F426.471
  17. Study on a Local Government to Improve the Information and Intellectual Support for Scientific and Democratic Decision-Making,D630
  18. The Research about Performance Management of Advanced Vocational and Technical Teachers,G717
  19. Performance Assessment and Countermeasure Research of Modern Information Service in Central Districts,F49
  20. In Strategic Performance Management for an X Airlines Performance Management System Design,F272
  21. Research on Application of the Civil Servants’ Performance Evaluation Results,D630.3

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net  Mobile