The Numerical Analysis on the Deep Foundation Pit Excavation by Steps of Subway Station

Author: MaZongFeng
Tutor: BiWeiGuo
School: Shandong University of Science and Technology
Course: Disaster Prevention and Reduction Engineering and Protective Engineering
Keywords: subway station deep foundation pit underground diaphragm wall deformation mechanism control measures numerical simulation
CLC: TU753
Type: Master's thesis
Year: 2010
Downloads: 317
Quote: 0
Read: Download Dissertation

Abstract


At present, subways construction is in full swing in mangy large cities of China. As a result, a large number of excavation engineering occurs automatically. And the size and depth of the foundations are increasing continuously. People pay more and more attention to the security problems and the influence on surrounding environment because of excavation engineering.The excavation engineering incorporates many subjects such as the geotechnical and structural engineering into an organic integrity, which is highly comprehensive and influenced by many factors. In the excavating process, not only the stability of excavation should be ensured in order to construct all kinds of engineering both inside and outside excavation safely, but also the safety of facilities such as adjacent buildings and underground pipe-lines should be ensured. So doing research about the displacement after excavation and the stability of soil and supporting structure is an essential problem.This paper mainly introduces the following content:the features, deformation and deformation mechanism of excavation engineering; the status of earth pressure theories on excavation engineering; the influence factors of deformation; the application on excavation engineering by Finite Difference Software FLAC3D; the control measures on deformation and so on.The deformation must happen in foundation pits in the process of excavation, which includes horizontal displacement of underground diaphragm walls, ground surface settlement and bottom heave. This paper simulated the process of excavation by Numerical Analysis Software FLAC3D, taking Xi Xiang Station of Shenzhen Metro for example. In the process of numerical analysis, this paper simulated the properties of soil by Mohr-Coulomb Plasticity Model, underground diaphragm walls and steel timbering by elastic materials, the contact between walls and soil, then simulated the process of excavation in steps and multi-timbering structure construction. At last, this paper obtained the changing situation of displacement during the process of excavation in steps and multi-timbering structure construction. In the mean time, the control methods of deformation of foundation pit are summarized. This paper’s conclusion provides reliable reference to design, informational construction and construction monitoring of deep foundation pit.

Related Dissertations

  1. The Setting Bases of Working Pressure in LNG Systems and Orthogonal Experiment Design of Heat Exchangers,TQ051.5
  2. Study on Springback of High-Strength Steel Stamping,TG386
  3. Numerical Simulation and Experiment on Hydroforming of Cups with Controllable Radial Pressure,TG386
  4. Research on Technology and Mechanism of Joining Cemented Carbide to Carbon Steel,TG454
  5. Numerical Simulation of Film Cooling in Turbine Cascade with Non-Axisymmetric Endwall Method,V231.3
  6. High Speed Aerodynamic Convection and Coupled Heat Transfer of Complicated Bodies,V215.4
  7. The Analysis on Characteris of Vibration Source about Vertical Vibration of Surrounding Environment Induced by Rail Transit,U211.3
  8. Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
  9. Study on the Heat Transfer Characteristics of Particle Cluster in Circulating Fluidized Bed,TK124
  10. Numerical Simulation of SNCR Process of a 600MW Utility Boiler,TK222
  11. Numerical Simulation of Biomass Direct Reburning,TK16
  12. Numerical Simulation on Pulverized Coal Combustion Process in a 670T/H Tangential Firing Furnace,TK224.11
  13. Numerical Simulation on the Combustion Process in the Furnace of a 1000MW Lignite-Fired USC Boiler,TK224.11
  14. Study on Gas-Solid Two-Phase Flow in Spouted Beds,TK173
  15. Experimental Study and Numerical Simulation on Aerodynamic Field of Tangential Bias Swirl Burner,TK223.23
  16. Characteristic Study of Combustion in Central Reverse Flame Chamber,TK223.21
  17. Numerical Simulation and Contrastive Analysis of Labyrinth Seals and Leaf Seals,TK263.2
  18. Numerical Study on Phosphorus Distribution in Water Environment of the Three Gorges Reservoir,X832
  19. The Design and Performance Simulation of External Valve Small Displacement Pump,TE933.3
  20. Analysis of the Impact of Tailings Dam Stability under Seepage Role,TV649
  21. Study on Hydraulic Fracturing of Low Permeability Reservoir,P618.13

CLC: > Industrial Technology > Building Science > Construction > The project and the type of work > Foundation engineering
© 2012 www.DissertationTopic.Net  Mobile