Dissertation > Excellent graduate degree dissertation topics show

Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing

Author: ZhuYanFeng
Tutor: ZhouXiaoJun
School: Southwest Jiaotong University
Course: Bridge and Tunnel Engineering
Keywords: Subway Station Construction mechanics Finite Element Surface subsidence Control standards
CLC: U231.4
Type: Master's thesis
Year: 2007
Downloads: 216
Quote: 10
Read: Download Dissertation

Abstract


Currently, the largest city rail transit network planning and construction , the new line through the existing railway line station is the inevitable question , when the construction of its short-range interaction is very complex , and how to minimize the impact , both to ensure that the new the smooth construction of the structure , but also to ensure the safety of the existing lines , the normal operation , seeking a safe , reasonable and economical construction methods has become an important issue . Since the construction of the railway network of China 's major cities is not perfect . It can be predicted that the new repair line station with the existing lines the station interchange of engineering , will continue to occur in the future the ground railway network construction process . There is no doubt that the impact of the construction of the new line stations across the existing railway line station , as well as short-range construction impact in-depth study is very useful and necessary . Sports West Road , Guangzhou Metro Station , calculated by the numerical simulation of a new metro line station beneath the existing subway station construction process , analysis beneath the station on the existing station , the following main research content : ( 1 ) calculated using the common mode of action of the stratigraphy and structure of the elastic-plastic three-dimensional finite element , consider the effect of the construction process of the space , construction mechanics analysis by finite element software Ansys , in the construction process is to get a new pit and existing station structure deformed by the force of law , as well as surface subsidence caused by construction . ( 2 ) study the construction of surface subsidence in the existing line operators , the selection of the optimal mechanical parameters and supporting structure parameters . Reasonable excavation , reduce excavation footage advance support , reduce the disturbance of blasting construction on the surrounding rock , and at the same time to ensure the safe operation of the existing station , the successful completion of the construction of new repair line station . ( 3) In order to facilitate the monitoring of the cut tunnel measurement , evaluation of metro tunnel construction on the safety of existing structures and methods , and reference to past experience in construction , surface subsidence control value calculated as a construction monitoring measurement indicators. Finally, the main conclusions of the deficiencies and recommendations of the study are discussed and put forward their own views and opinions .

Related Dissertations

  1. Research on the Mainframe System of Powder Mixed EDM and the Craft Experiment,TG661
  2. EDM Electrode Wear Mechanism and Control Research,TG661
  3. Research on the Structure and Characteristics of Permanent Magnetic Coupling,TH139
  4. Finite Element Analysis and Structure Optimal Design for Combined Seal at Normal Temperature and Low Temperature,TH136
  5. Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
  6. Simplified Analysis of Semi-Rigid Steel Frames under Vertical Loading,TU391
  7. Based on Nonliner Finite Element Analysis of the Infilled Wall Frame Structure,TU323.5
  8. Stability Analysis of Roller Compacted Concrete Gravity Dam Based on Time-history Method,TV642.2
  9. Study on the Design and Biomechanical Behaviors of Individualized Artificial Knee Joint,R318.1
  10. Design of Testing Equipment for Electronic Products,TN06
  11. S-lay Installation Analysis for Deepwater Pipeline,TE973
  12. Research on Intelligent Aerial Bomb for Forest Fire Fighting,S762
  13. Multi-pin Internal Fixation of Calcaneal Fractures in Finite Element Analysis,R687.3
  14. The Analysis and Comparison of Adjacent Segment Degeneration of the Finite Element Caused by Three Posterior Lumbar Fusion Style,R687.3
  15. The Establishment and Preliminary Application of the Three-dimensional Finite Element Model of Ankle Joint,R687.3
  16. Different Bottom Structure of Dental Brackets Affect the Adhesiveness-Three Dimensional Finite-element Analysis,R783.5
  17. Airborne radar antenna pedestal rapid design systems research and development,TN959.73
  18. Sham hose drum drive means and hydraulic system of the structure,TE973
  19. Grade II mine backfill mining village of coal under Mode,TD823.7
  20. The magnetorheological damper mechanical properties and Gun Recoil,TB535.1
  21. Nonlinear Structural Dynamics Analysis and Optimization Design on Naval Gun Driver,TJ391

CLC: > Transportation > Rail transport > Special railway > Mass Transit Railway > Subway station