Currently, the largest city rail transit network planning and construction , the new line through the existing railway line station is the inevitable question , when the construction of its short-range interaction is very complex , and how to minimize the impact , both to ensure that the new the smooth construction of the structure , but also to ensure the safety of the existing lines , the normal operation , seeking a safe , reasonable and economical construction methods has become an important issue . Since the construction of the railway network of China 's major cities is not perfect . It can be predicted that the new repair line station with the existing lines the station interchange of engineering , will continue to occur in the future the ground railway network construction process . There is no doubt that the impact of the construction of the new line stations across the existing railway line station , as well as short-range construction impact in-depth study is very useful and necessary . Sports West Road , Guangzhou Metro Station , calculated by the numerical simulation of a new metro line station beneath the existing subway station construction process , analysis beneath the station on the existing station , the following main research content : ( 1 ) calculated using the common mode of action of the stratigraphy and structure of the elastic-plastic three-dimensional finite element , consider the effect of the construction process of the space , construction mechanics analysis by finite element software Ansys , in the construction process is to get a new pit and existing station structure deformed by the force of law , as well as surface subsidence caused by construction . ( 2 ) study the construction of surface subsidence in the existing line operators , the selection of the optimal mechanical parameters and supporting structure parameters . Reasonable excavation , reduce excavation footage advance support , reduce the disturbance of blasting construction on the surrounding rock , and at the same time to ensure the safe operation of the existing station , the successful completion of the construction of new repair line station . ( 3) In order to facilitate the monitoring of the cut tunnel measurement , evaluation of metro tunnel construction on the safety of existing structures and methods , and reference to past experience in construction , surface subsidence control value calculated as a construction monitoring measurement indicators. Finally, the main conclusions of the deficiencies and recommendations of the study are discussed and put forward their own views and opinions .
|
Related Dissertations
- Research on the Mainframe System of Powder Mixed EDM and the Craft Experiment,TG661
- EDM Electrode Wear Mechanism and Control Research,TG661
- Research on the Structure and Characteristics of Permanent Magnetic Coupling,TH139
- Finite Element Analysis and Structure Optimal Design for Combined Seal at Normal Temperature and Low Temperature,TH136
- Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
- Simplified Analysis of Semi-Rigid Steel Frames under Vertical Loading,TU391
- Based on Nonliner Finite Element Analysis of the Infilled Wall Frame Structure,TU323.5
- Stability Analysis of Roller Compacted Concrete Gravity Dam Based on Time-history Method,TV642.2
- Study on the Design and Biomechanical Behaviors of Individualized Artificial Knee Joint,R318.1
- Design of Testing Equipment for Electronic Products,TN06
- S-lay Installation Analysis for Deepwater Pipeline,TE973
- Research on Intelligent Aerial Bomb for Forest Fire Fighting,S762
- Multi-pin Internal Fixation of Calcaneal Fractures in Finite Element Analysis,R687.3
- The Analysis and Comparison of Adjacent Segment Degeneration of the Finite Element Caused by Three Posterior Lumbar Fusion Style,R687.3
- The Establishment and Preliminary Application of the Three-dimensional Finite Element Model of Ankle Joint,R687.3
- Different Bottom Structure of Dental Brackets Affect the Adhesiveness-Three Dimensional Finite-element Analysis,R783.5
- Airborne radar antenna pedestal rapid design systems research and development,TN959.73
- Sham hose drum drive means and hydraulic system of the structure,TE973
- Grade II mine backfill mining village of coal under Mode,TD823.7
- The magnetorheological damper mechanical properties and Gun Recoil,TB535.1
- Nonlinear Structural Dynamics Analysis and Optimization Design on Naval Gun Driver,TJ391
CLC: > Transportation > Rail transport > Special railway > Mass Transit Railway > Subway station
© 2012 www.DissertationTopic.Net Mobile
|