Dissertation > Excellent graduate degree dissertation topics show

Research on the Project Company’s Organization Risk Management under PFI Model

Author: ZhengHuiYun
Tutor: WangDaoPing
School: Hunan University
Course: Business Administration
Keywords: PFI Model Risk Management Orgnization Risk Project Company D-S Evidence Theory
CLC: F283
Type: Master's thesis
Year: 2009
Downloads: 54
Quote: 0
Read: Download Dissertation

Abstract


In recent years, with the acceleration of urbanization process in China, the construction of public projects has become an increasing concern. However, at present the shortage of public construction projects becomes more striking, and the the lack of funds is the most immediate constraint. PFI model, as a new type of public project construction and financing model, not only can help the government solve the problem of insufficient funding and but also improve the investment and management efficiencys. Because of its high risk, risk management has always been the core issue in running PFI project. Organization risk, as one of the important risks for private sector when participating in the PFI project, how to manage it effectivly is a problem need to be studied.Based on the theory of PFI model, project risk management, and project organization management, combining with the status of the construction and financing of public projects in China, this paper studies the project company’s organizational risk management in the PFI project. We take Risk Identification→Risk Assessment→Risk Response as the main line. We construct a three-dimensional risk map and an evaluation index system. Furthermore, we employ the D-S evidence theory to conduct comprehensive evaluation.Firstly, risk identification. According to the content of project organizational risk, we build a three-dimensional risk map constituted with three dimensions- the organizational structure risk, human resource risk and stakeholder risk. And then we broken it down into specific risk factors to analyze and elaborate.Sencondly, risk assessment. According to the results of risk identification and reference to the expert advice, we build an evaluation index system including 12 modules and 31 individual indicators. To overcome the past evaluation methods’shortcoming that can not handle the uncertainty information, this paper tentativly introducte the D-S evidence theory, and build a multi-level hierarchical model of integrated risk assessment. The steps are: Obtain source data of evidence; determine the evaluation criteria and the basic support; determine the index weight by FAHP; structure mass function; do comprehensive evaluation of risk. Taking a county sewage treatment projects for example, we apply the model to the instance.Lastly, risk response. From three aspects–the arrangement for the project company’s organizational structurethe, the human resource risk management, the risk-sharing mechanisms for the project stakeholders, we propose the risk response measures. Designe a matrix organization chart for the project company; put forward specific measures to manage the recruitment risk, the use of personnel risk, and the personnel changes risk; use the game theory to explain the basic principles of risk-sharing and accordingly determine a detailed risk-sharing program.

Related Dissertations

  1. Research on Joint Target Detection for Dual-Sensor Image and System Implementation,TP391.41
  2. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  3. Open pit production accidents studied because of the risk management measures,TD771
  4. The Competition Management System of Harbin 24th Winter Universiade 2009’s Risk Management,G812.2
  5. The Innovative Study Based on the Equity Financing of Forest Management from the View of Sustainable Development,F326.2
  6. Offshore oil platform construction phase Operational Risk Management Research,F426.22
  7. Chemical Industrial Park Environmental Risk Management Technology Source,X327
  8. A Construction Project Owner Risk Management Research,F284
  9. Study on Ecosystem Risk Management of Coal Mine Based on Fuzzy Cognitive-map and Stakeholders’ Participation,X322
  10. Research on Risk Management of Shenyang Yuanda Internal Curtain Wall Project,F426.92
  11. The Compliance Risk Management Study of the Rural Financial Institutions,F832.35
  12. New Basel Capital Accord and Commercial Bank Risk Management,F832.2
  13. Research on the Information Risk Management of the Credit Cooperatives of Shandong Online Banking,F832.2
  14. The CD Commercial Bank IT Risk Management,F832.2
  15. Reseaching on Using of Credit Derivatives of Our Country,F224
  16. The Reform Direction of Baselii Accord under Subprime Crisis and the Inspiration to China,F832.1
  17. Research on the Evaluation and Model of Apparel Supply Chain Risk for Apparel Manufacturing Enterprises,F274;F224
  18. The Research of the Risk Management during the Project of Acrylic Acid in Huayi Corporation,F426.72
  19. Improvement of Laws on the Risk Control of Credit Card Fraud,D924.3;F832.2
  20. Research on Internal Control of X State-owned Grain Enterprise,F324.9
  21. Alleviate the Financial Dilemma of Small and Medium-sized Enterprises System Design,F276.3

CLC: > Economic > Economic planning and management > Infrastructure the economy > Infrastructure investment and economic benefits
© 2012 www.DissertationTopic.Net  Mobile