Dissertation > Excellent graduate degree dissertation topics show
Research on Management Scheme of Chengde Station Installation of Series Compensation Engineering for Shangdu-Chengde 500kV Transmission Project
Author: FanWeiJie
Tutor: LuJianChangļ¼LiuJun
School: North China Electric Power University
Course: Industrial Engineering
Keywords: TCSC Construction program Engineering Management Safe construction
CLC: TM73
Type: Master's thesis
Year: 2011
Downloads: 22
Quote: 0
Read: Download Dissertation
Abstract
|
Grid of the building need to invest huge amounts of money , but also take up a lot of land , there is an urgent need for a only help short construction period, low cost , and suitable for China 's large-capacity , long-distance transmission characteristics of flexible AC transmission technology . TCSC technology can significantly improve the power transmission capacity of existing and new transmission lines and grid security and stability , which is the most advanced , the most representative flexible AC transmission technologies . The Order of the 500KV line above this article Chengde station installation of series compensation project management program for the study . First of a series compensation project overview introduces the significance of Transmission Line Series Compensation and installation of series compensation , series compensation project characteristics , the general layout of the construction site , and clearly the scope of the project contracting ; Then, the paper focuses on a series compensated construction program, introduces the construction of series compensation programs , the need for installation of series compensation device , construction preparation and construction process of the project overall arrangements , in the last part of this chapter highlights the major process and special process of construction project , construction Difficulties and construction program to be taken ; Second , the implementation of the program of the series compensation project management analysis focus from the construction period goals and the construction schedule , quality objectives , quality assurance system , safety assurance system , the organization measures and work plan , cost the control objectives and control measures for analysis ; Finally, the concluding part of the paper summarizes the theoretical and practical significance . Science in this article , a reasonable engineering management program on the Order of the 500kV line the Chengde station installation of series compensation study , is conducive to the smooth implementation of the project and similar projects to promote , for the future implementation of the transmission line series compensation project management valuable experience and scientific and rational basis .
|
Related Dissertations
- SSH framework based publication management system design and implementation,TP311.52
- Dongguan Mobile based \,F626
- The Research of Management Undergraduate Education "Quality Engineering" Project,G642.4
- Large section tunnel construction method and load distribution mechanisms of complex conditions,U455.4
- The Modeling and Simulation Research of FACTS,TM743
- TCSC in Study of Reactive Power Compensation,TM761
- Research of Dynamic Reactive Power Compensation Circuit Based on PWM-control,TM714.3
- Study and Development of Project-Oriented Impendance Control of Thyristor Controlled Series Compensation,TM761
- Based on the concept of postmodernism Korean language education courses professional courses constructed of flexible solutions,H55
- Fixed Intelligent Backbone Network Construction of Bearing,TN915.02
- The M City Telecom IDC room pre-construction project management research,F626
- The Research and Software Development of User Defined Modeling Method,TM743
- The Impact of TCSC on Power System Stability,TM712
- Research on the Control Strategy for Improving Power Transmission Capability by Thyristor Controlled Series Compensation,TM761
- Study on Small Signal Stability of Power System Containing Flexible Devices,TM712
- Study on the Construction Technology of Water Diversion Buried Culvert under Complex,TV672.1
- The Construction Plan of New Multi-function Tugboat,U674.181
- The Construction Monitoring and Controlling Cable-stayed Bridge with Inclined and Arched Tower,U448.27
- On the administrative enforcement system,D922.1
- The Research of Government Purchasing Problem in Public Works Implementation in Sanshui District of Foshan,F812.45
- An Analysis of Research Methods for Construction Management,F224
CLC: > Industrial Technology > Electrotechnical > Transmission and distribution engineering, power network and power system > Power system scheduling, management, communication