Dissertation > Excellent graduate degree dissertation topics show

Research on Management Scheme of Chengde Station Installation of Series Compensation Engineering for Shangdu-Chengde 500kV Transmission Project

Author: FanWeiJie
Tutor: LuJianChangļ¼›LiuJun
School: North China Electric Power University
Course: Industrial Engineering
Keywords: TCSC Construction program Engineering Management Safe construction
CLC: TM73
Type: Master's thesis
Year: 2011
Downloads: 22
Quote: 0
Read: Download Dissertation

Abstract


Grid of the building need to invest huge amounts of money , but also take up a lot of land , there is an urgent need for a only help short construction period, low cost , and suitable for China 's large-capacity , long-distance transmission characteristics of flexible AC transmission technology . TCSC technology can significantly improve the power transmission capacity of existing and new transmission lines and grid security and stability , which is the most advanced , the most representative flexible AC transmission technologies . The Order of the 500KV line above this article Chengde station installation of series compensation project management program for the study . First of a series compensation project overview introduces the significance of Transmission Line Series Compensation and installation of series compensation , series compensation project characteristics , the general layout of the construction site , and clearly the scope of the project contracting ; Then, the paper focuses on a series compensated construction program, introduces the construction of series compensation programs , the need for installation of series compensation device , construction preparation and construction process of the project overall arrangements , in the last part of this chapter highlights the major process and special process of construction project , construction Difficulties and construction program to be taken ; Second , the implementation of the program of the series compensation project management analysis focus from the construction period goals and the construction schedule , quality objectives , quality assurance system , safety assurance system , the organization measures and work plan , cost the control objectives and control measures for analysis ; Finally, the concluding part of the paper summarizes the theoretical and practical significance . Science in this article , a reasonable engineering management program on the Order of the 500kV line the Chengde station installation of series compensation study , is conducive to the smooth implementation of the project and similar projects to promote , for the future implementation of the transmission line series compensation project management valuable experience and scientific and rational basis .

Related Dissertations

  1. SSH framework based publication management system design and implementation,TP311.52
  2. Dongguan Mobile based \,F626
  3. The Research of Management Undergraduate Education "Quality Engineering" Project,G642.4
  4. Large section tunnel construction method and load distribution mechanisms of complex conditions,U455.4
  5. The Modeling and Simulation Research of FACTS,TM743
  6. TCSC in Study of Reactive Power Compensation,TM761
  7. Research of Dynamic Reactive Power Compensation Circuit Based on PWM-control,TM714.3
  8. Study and Development of Project-Oriented Impendance Control of Thyristor Controlled Series Compensation,TM761
  9. Based on the concept of postmodernism Korean language education courses professional courses constructed of flexible solutions,H55
  10. Fixed Intelligent Backbone Network Construction of Bearing,TN915.02
  11. The M City Telecom IDC room pre-construction project management research,F626
  12. The Research and Software Development of User Defined Modeling Method,TM743
  13. The Impact of TCSC on Power System Stability,TM712
  14. Research on the Control Strategy for Improving Power Transmission Capability by Thyristor Controlled Series Compensation,TM761
  15. Study on Small Signal Stability of Power System Containing Flexible Devices,TM712
  16. Study on the Construction Technology of Water Diversion Buried Culvert under Complex,TV672.1
  17. The Construction Plan of New Multi-function Tugboat,U674.181
  18. The Construction Monitoring and Controlling Cable-stayed Bridge with Inclined and Arched Tower,U448.27
  19. On the administrative enforcement system,D922.1
  20. The Research of Government Purchasing Problem in Public Works Implementation in Sanshui District of Foshan,F812.45
  21. An Analysis of Research Methods for Construction Management,F224

CLC: > Industrial Technology > Electrotechnical > Transmission and distribution engineering, power network and power system > Power system scheduling, management, communication
© 2012 www.DissertationTopic.Net  Mobile