Dissertation > Excellent graduate degree dissertation topics show

Risk Identification Techniques in Construction Period of Major Bridge and the Study on Risk Handling

Author: XueYanXin
Tutor: LiQingFu;ZhangPeng
School: Zhengzhou University
Course: Hydraulic Structure Engineering
Keywords: Major bridges Risk identification techniques RFAHP Risk rank evaluation standard The uncertainty of risk analysis Risk response
CLC: U445.1
Type: Master's thesis
Year: 2011
Downloads: 157
Quote: 1
Read: Download Dissertation

Abstract


The activities, which occur during the construction period of a bridge project, have close relationships with economic、technology、organization and management, and the relationships determine the project should face many uncertain factors during construction period. However, the uncertain factors would be identified and active processed to avoid loss which possibly occurs. This paper regards construction risks in large bridge project as study object. The assertion is developed as follow:(1)Study of the risk identification during large bridge construction period. Firstly the basic principle and development of risk identification are expatiated; In view of the risk factors on bridge construction are different level and have complex relationships with each other, and considering the bridge construction accident statistics are lack and integrated risk database are uncreated, then Analytic Hierarchy Process(AHP) is proposed to solve the problems in bridge construction risk identification, which is a qualitative and quantitative method and proved to be an ideal of risk identification method.(2)Research on risk grate evaluation criterion during large bridge construction period. Building risk grate has significant importance in risk identification, thus the risk grate evaluation criterion for enterprise、society and environment are given based on related manuals and regulations and numerous studies, so as to provide support for identifying the risk during bridge construction period and guidance for risk grate evaluation criterion in future.(3)Study on indetermination in process of risk analysis. Some Problems existing in application of present risk analysis theory on bridge engineering are were pointed out, and then uncertainties are summarized, which happen on the indetermination in process of risk analysis based on risk analysis theory. Therefore, to solve these problems, the methods for eliminating or reducing uncertainties in process of risk analysis are given.(4)Research on countermeasures of the risk. With the multi-dimension of risk factors, the AHP is proposed to solve priority in countermeasures of the risk.

Related Dissertations

  1. Students' Survival Training risk management theory and empirical research,G807.4
  2. Research on Risk Management for Large-Scale Public Transport Project,F572;F283
  3. Security Risk and Countermeasures Studies of Nanchang Metro Construction,U231.3
  4. Research on Risk Management about the Relocation and Construction of Zhangdian Project,F426.31
  5. Xinzhou Naoyang Event Risk Management,G852.9
  6. Risk Analysis and Its Application for Tunnel Works Based on Research of Stratum and Soil Spatial Variability,U455.43
  7. Research on Risk Management of Freeway Investment Based on Ecological Theory,F540
  8. Span continuous rigid frame bridge construction period of Risk Analysis,U448.23
  9. Corporate strategic risk identification, assessment and response studies,F272
  10. Risk Management Information System Project,F49
  11. Turnkey project of international engineering, procurement and construction (EPC) contract risk control,F284
  12. The Risk Analysis of PPP Project,F283
  13. Shandong section of Eastern Route Project Risk and Coping Research,TV68
  14. Reasons and Management Countermeasure on Risk Management of High Education Quality,G647
  15. Aviation projects running in the risk identification and response,F407.5
  16. Economic responsibility audit risk assessment and response,F239.47
  17. Software Project Risk Management,TP311.5
  18. The Ship Collision Risk Analysis of Large Span Prestressed Concrete Girder Bridges During Construction,U445.1
  19. Research on Salary Management of Risk Indicator System and Risk Response in China’s Institutions of Higher Learning,G647
  20. Study on risk management of real estate projects,F293.3
  21. Architectural Engineering Project Construction Risk Management Study,TU71

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction organization and management
© 2012 www.DissertationTopic.Net  Mobile