BOT Highway Construction Project Schedule Control Analysis
Author: ZhangJing
Tutor: LiQiang
School: Southwest Jiaotong University
Course: Project Management
Keywords: BOT Highway Construction Project Schedule Control
CLC: F284;U415.2
Type: Master's thesis
Year: 2011
Downloads: 112
Quote: 0
Read: Download Dissertation
Abstract
|
China’s rapid development in recent years, highway construction, especially in the Second Five-Year Plan target is confirmed, China will build more than 80,005 thousand kilometers of national highway network. However, the highway construction of a large amount of investment, the characteristics of a long construction period. At present the average per km of highway construction costs up to 3000 million yuan, the face of the huge investment, the Government appeared to be inadequate. In order to solve the needs of the rapid development of highway construction and highway construction funds relative shortage. Promote the rapid development of highway construction to promote the rapid development of the national economy; there has been a variety of road construction financing. The BOT financing for its unique way of raising funds attracted much attention.Since China started late in the BOT model, a lot of investment company managers lack management experience, in the BOT project progress control process because of mismanagement, possible extension of the final project will directly shorten the operating hours of operation of or delay To reduce the project in return may lead to a serious project to give up. Therefore, to ensure that the project be able to play ahead of economic efficiency, the investment company a reasonable profit, the BOT highway projects, the use of correct and effective ways and means to control the progress of project construction and management is very important.Presented in this study:The first through the relevant literature summarizes the progress control of construction projects concepts, principles, methods and measures. And described the progress of the management process. And describes the progress of management of several common methods, such as:bar charts, network diagrams, forward progress of the line, flow chart.Then, collecting, analyzing a large number of cases of BOT highway construction project information, and summed up in the BOT difficulties encountered in highway construction and control measures, mainly the elaboration of progress control.Finally, South beam highway construction projects, and progress control with the relevant principles, methods, and measures the actual progress of construction on the project control and management. The process of implementation achieved good results. Conclusion:The use of reasonable methods and schedule control measures targeted on the progress of BOT highway construction process control is very effective. Especially in the process of building BOT highway, a greater impact on the progress of the factors.
|
Related Dissertations
- The Study on Risk Evaluation of BOT Projects in China University,G647
- The Research on Comprehensive Budget Management of Highway Operation Management Units,F540.58
- The Research on Evaluation Method of Highway Ecosystem Healthy,X826
- Study on the Quantified Model of Public Participation in Highway Environmental Impact Assessment,U41
- Study on the Internal Control Issues of Highway Construction Investments,F540.34
- Research on Construction Accident Factors’ Interaction Relations,TU714
- Study on Schedule Plan and Control of Smart Card Appllying System for HNU,TP399-C1
- Research on Agent Construction System Management Model of Highway Project,F283
- A Construction Project Owner Risk Management Research,F284
- Heilongjiang Unicom WCDMA network project schedule management research,F626
- Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
- Progress Control Research of GS Building,TU722
- Yanchang Oilfield Production Management of Construction Projects,F426.22
- Highway Maintenance Performance Evaluation Institutions,U418.2
- Wanglong River TunnelStability Analysis,U456.3
- Study on the First Grade Highway Upgrade Project Traffic Organization in Inner Mongolia,U491
- Study on Planning Theory of Highway Network Based on Transportation Demand,U412.1
- Study on the Collector-distributor Road in the Interchanges on Freeway,U491.22
- Investigation and Fuzzy Comprehensive Evaluation of Eco-Slope Protection on Tong Huang Expressway,U418.9
- Study on the Design of Ecological Highway in Yellow River Delta,U412
- A Study of Interests Protection in Settlement of Surplus Staff in Road Industry Reform of Henan Province,F542
CLC: > Transportation > Road transport > Road works > Road construction > Construction organization
© 2012 www.DissertationTopic.Net Mobile
|