Dissertation > Excellent graduate degree dissertation topics show

Non Mining Subsidence Monitoring System of Xu Tuan Coal Mime and the Prediction Model

Author: PanYu
Tutor: WangLiePing
School: Anhui University of Technology
Course: Geodesy and Survey Engineering
Keywords: non-mining land subsidence subsidence monitoring adjustment datum grey model
CLC: TD325.4
Type: Master's thesis
Year: 2012
Downloads: 35
Quote: 0
Read: Download Dissertation

Abstract


In the past century, human’s uncontrolled exploitation of groundwater has caused serious surface settlement all over the world. As a kind of widespread geological hazards, surface settlement can cause great harm to the earth’s natural environment and human daily life. As a coal mine industry square, there is a great threat which was caused by the main and auxiliary shafts’ base of mine subsidence which was leaded by the surface settlement in mine production and mine safe.Taking Xutuan coal mine as an example, the non-mining subsidence monitoring system of the coal mine industry square and the main and auxiliary shafts’base has been build based on principles and methods of deformation monitoring in this paper. According to National second order leveling standard,4times overall observations for subsidence monitoring network has been collected, and the secondary network has been lasted for9periods. The stability analysis of the reference points by the observation data. The quasi-stable adjustment has been used to process the first network observation data, and the difference has been tested for the working points. The fixed datum, gravity datum and quasi-stable datum were used to process the monitoring network data, the gravity datum has been selected as the adjustment datum of the monitoring network. From the results of adjustment data, the maximum settlement of the main and auxiliary shafts’base of mine were242.7mm and240.7mm, the maximum settlement difference were4.0mm and4.1mm. By contrasting the dynamic change curve of the drilling water level with the subsidence curve of the coal mine industry square, the result which the significant and hysteretic relationship between land subsidence and water level variation had been showed in this passage.The GM (1,1) model and the prediction method were introduced in this passage. According to the theory of grey system, the equal-dimension and new-information model was has been built after Equaled the interval of the non equal interval data sequence and preferred the best dimension through the comparison with the model error. From settlement prediction data, the maximum of predicting data residual error of the main and auxiliary shafts’base of mine were0.9mm and1.3mm. Through the model precision evaluation, the accuracy of model reached the highest level. The settlement value of the main and auxiliary shafts’base of mine in January2012was predicted at last.The adjustment program which designed to process settlement data and the GM(1,1) prediction program based on Microsoft Visual Studio2008were introduced in this passage.

Related Dissertations

  1. Study on the Application of InSAR Technique in Monitoring Ground Subsidence,P225.1
  2. Study of the Laws of the Rock Strata Movement Based on the Mine of Thick Topsoil and Deep Mining,TD325
  3. The Application of SBAS-InSAR Technology in Datong Land Subsidence Monitoring,P642.26
  4. 3-D Numerical Analysis on Settlement of Ground Surface Caused by Shallow Metro Tunnel Excavation,U456.3
  5. Research on the Datum of Multi-spectral Expanding Collimating System,TH741
  6. Based on wavelet analysis for GPS dynamic deformation modeling of data processing and forecasting,P228.4
  7. Application in Study on Ground Deformation in Xi’an with Dislocation Theory Model,P642.26
  8. Study on the Application of Modified Grey Models in Data Analyzing of Deformation Monitoring,TU196.1
  9. Time Series PS-InSAR Using Small Data Set and Its Application to Surface Subsidence,P642.26
  10. Simulation of Dynamic Change in Land Utilization Toksun County Based on CLUE-S Model,F321.1;F224
  11. Medium and long-term prediction method and its application research,N945.24
  12. Research on Short-Term Load Forecasting Method Based on Rough Set and Gray System Model,TM715
  13. The Construction and Application of Grey Forecast Model in Traffic Accident of Beijing,N941.5
  14. Research on the Development of Shandong Peninsula International Logistics,F259.27
  15. Network Traffic Prediction Based on Grey Neural Network Model,TP393.07
  16. The Performance Analysis on Environmental Regulation of China,F224
  17. Study on International Logistics in the Middle Part of China from the Prospective of Bonded Logistics Center,F259.2
  18. Monitoring Prediction and Finite Element Analysis of Piles Settlement in Shen Yang Ming Cheng High Buildings,TU473.1
  19. A Research on Ecological-city Based on Ecological Footprint of Wuhua District of Kunming City,X22
  20. Research on the Indexes for Integrated Control of Groundwater Resources in Tianjin,P641.8
  21. Design and Analysis on Miniaturized Microstrip Lowpass Filters with Wide Stopband,TN713.4

CLC: > Industrial Technology > Mining Engineering > Mine the pressure and support > Rock pressure and rock movement > Rock movement > Rock and ground movement monitoring and control
© 2012 www.DissertationTopic.Net  Mobile