Abstract


The stratigraphic effect and the mechanical behavior of the structure caused by Stereo cross tunnel constructionis very complicated. The newly built the construction of the tunnel, make the first built around the tunnel wall rock relaxation, especially in the tunnel near the construction, this effect will be more obvious, severe fracture failure of the tunnel structure and the surrounding rock collapse slip shift. Therefore, the reasonable construction method is particularly important. Based on the underwater ultra-shallow section overpass tunnel building technology research topics, and take the east coast of Xiangjiang Tunnel in Changsha Yingpan Road as the background, using the numerical simulation of the research methods, focus on the parallel interchange tunnel construction sequence and the interchange area close construction effect of the partition, the major work completed as follows:(1) The Yingpan Road tunnel east coast parallel the interchange upper C, D, ramp excavation on the lower part of North and South main line of the second disturbance, resulting in the mainline tunnel in which the stress environment changes, affecting mainly the arch of the tunnel.(2) Four construction sequence programs about underground parallel interchange tunnel are provided. And it analyzes the calculation of three-dimensional numerical simulation. After Comprehensive comparison of multiple indicators survey, the best sequence of construction is to excavate the lower part of the tunnel firstly and then excavate the upper tunnel.(3) Obtained the settlement of ground surface, the stress field of interchange site soil and the stress rule of initial support structure under different spacing conditions, and finally it gives approaching construction of division of the four tunnel parallel interchange of Changsha City interchange tunnel underground parallel.(4) When the vertical spacing is larger than4D, it didn’t need to consider the vertical spacing of parallel interchange tunnel close construction influence, can be considered as two parallel tunnels. And when the level spacing is larger than4D, it didn’t need to consider the level spacing of parallel interchange tunnels close construction influence, can be considered as two intersecting tunnels.

Related Dissertations

  1. The Setting Bases of Working Pressure in LNG Systems and Orthogonal Experiment Design of Heat Exchangers,TQ051.5
  2. Study on Springback of High-Strength Steel Stamping,TG386
  3. Numerical Simulation and Experiment on Hydroforming of Cups with Controllable Radial Pressure,TG386
  4. Research on Technology and Mechanism of Joining Cemented Carbide to Carbon Steel,TG454
  5. Numerical Simulation of Film Cooling in Turbine Cascade with Non-Axisymmetric Endwall Method,V231.3
  6. High Speed Aerodynamic Convection and Coupled Heat Transfer of Complicated Bodies,V215.4
  7. The Analysis on Characteris of Vibration Source about Vertical Vibration of Surrounding Environment Induced by Rail Transit,U211.3
  8. Study on the Heat Transfer Characteristics of Particle Cluster in Circulating Fluidized Bed,TK124
  9. Numerical Simulation of SNCR Process of a 600MW Utility Boiler,TK222
  10. Numerical Simulation of Biomass Direct Reburning,TK16
  11. Numerical Simulation on Pulverized Coal Combustion Process in a 670T/H Tangential Firing Furnace,TK224.11
  12. Numerical Simulation on the Combustion Process in the Furnace of a 1000MW Lignite-Fired USC Boiler,TK224.11
  13. Study on Gas-Solid Two-Phase Flow in Spouted Beds,TK173
  14. Experimental Study and Numerical Simulation on Aerodynamic Field of Tangential Bias Swirl Burner,TK223.23
  15. Characteristic Study of Combustion in Central Reverse Flame Chamber,TK223.21
  16. Numerical Simulation and Contrastive Analysis of Labyrinth Seals and Leaf Seals,TK263.2
  17. Numerical Study on Phosphorus Distribution in Water Environment of the Three Gorges Reservoir,X832
  18. The Design and Performance Simulation of External Valve Small Displacement Pump,TE933.3
  19. Analysis of the Impact of Tailings Dam Stability under Seepage Role,TV649
  20. Study on Hydraulic Fracturing of Low Permeability Reservoir,P618.13
  21. Numerical Simulation and Experimental Study of Air-Assisted Sprayer of Orchard,S491

CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction methods
© 2012 www.DissertationTopic.Net  Mobile