Dissertation > Excellent graduate degree dissertation topics show

Research on Simulation and Scheduling Strategy in ARRAY Manufacturing System for TFT-LCD Fab

Author: YuHongWei
Tutor: GongYunPeng;JinZuo
School: Northeastern University
Course: Mechanical Design and Theory
Keywords: object-oriented simulation optimize ARRAY manufacturing system dynamic release rule compound priority dispatching
CLC: TN873.93
Type: Master's thesis
Year: 2009
Downloads: 36
Quote: 0
Read: Download Dissertation

Abstract


In the huge TFT-LCD Fab, the ARRAY manufacturing system is very complex with some special charateristics, such as re-entrance phenomenon, high uncetainty and multiple optimized objectives, etc.ARRAY manufacturing system is recognized as one of the most complex manufacturing systems in the world, existing lots of differences in comparation with traditional production line.Not like Japan and Korea, these main LCD production areas, manufacturing system of TFT-LCD Fab in China is still in the initial stage. The lag of manufacturing system planning and neglect of manufacturing system scheduling have resulted in poor performance of manufacturing systems, high cost and low market competition.Under this situation,some basic researches in connection with the Fifth-Generation ARRAY manufacturing system have been done in this paper.First, because of difficulty of quantifying ARRAY manufacturing system’s performance analysis, a computer simulation model with two-dimensional animation has been established for this production line by using object-oriented simulation technology, based on eM-Plant in this paper. The simulation model is composed with three parts:prodution object layer, scheduling control layer and data analysis layer. By simpliying the original physical model reasonably, production object layer is established containing AGV, processing machines, mechanical hands, storage spaces, etc. A lot of control programs have been written for release policies and real time scheduling rules(including machine dispatching and vehicle dispatching) by using SimTalk in scheduling control layer.By loading these SimTalk programs in prodution object layer, work for controlling this simulation model has been done. Some control rebars such as bottleneck-analyzer, logistic recording table,chart for coefficient of machine utilization are established in data analysis layer.Some dynamic targets such as average production cycle, work in process, throughput, machine efficiency can be analyzed in this layer to find the problems in this manufacturing system.Second, in this paper, father study about scheduling strategies of ARRAY manufacturing system has been done. For a single product release, a release rule for bottleneck stocker’s WIP balancing(RRWB) has been established to balance the WIP in Fab. For machine Dispatching, this paper has completed a compound priority dispatching strategy(CPDS).For vehicle dispatching, a dispatching rule for bottleneck stocker first(DRBF) has been established. By loading these arithmetic programs above into the simulation model, a new optimal simulation model has been established. The old strategies in the Fab include: Constant Release Interval(CONRIN), First IN First Out(FIFO), First Encountered First Serve(FEFS), etc.The simulation results show that:the optimal model has cut down the production cycle time, reduced the work in process, increased the productivity component, optimized some other important targets and also solved some practical problems just like lower productivity and high work in process in this manufacturing system.

Related Dissertations

  1. Study on Browning Factors and Process Optimization of Casein Purified from Qula,TS252.5
  2. Characteristic Study of Combustion in Central Reverse Flame Chamber,TK223.21
  3. Multiple ANN/HMM Hybrid Used in Speech Recognition,TN912.34
  4. Selection and Optimization of Control Technics in CODCr and Colority of the Refined Cotton Wastewater Treatment Process in a Refined Cotton Enterprise in Rudong, Jiangsu Province,X791
  5. Study on Business Process Reengineering of Nanchang Municipal Engineering Company,F299.24
  6. Vocational School Course Optimizing the Structure of the Case Study,G712.3
  7. Inventory Control and Optimization for Finish Goods in T Company,F253.4
  8. The Human Resources Optimize Allocation Investigation of Private Enterprise Base on the Competency Model,F272.92
  9. The Research of Optimizing Pe Course in Langfang Vocational and Technical College,G807.4
  10. Design on Implementing Scheme of Centralized Procurement for Personal Protect Equipment,F812.45
  11. Optimal Performance Evaluation System of Z Highway Maintenance Center,U418.2
  12. Investigation on Supplier Management Method of X Automotive Component China Company,F426.471
  13. Research of the No.1 Blast Furnace Multi-objective Optimal Model and the Energy Analysis of Ore Beneficiation Process in JISCO,TD951
  14. On Improving the Effectiveness of Mathematics Teaching in Junior Middle School by Optimizing Non-intellectual Factors,G633.6
  15. Numerical Simulation in Directional Solidification of Steel Ingot and the Study of Insulation Effect by Hollow Sidewall,TG111.4
  16. A Domain Specific Software Quality Evaluating Method Based on Genetic Algorithm Optimization,TP311.52
  17. Research on the Process Improvement of the Food Packaging Inspection: An Case of XX Inspection Institute,F203
  18. The Optimization Study of Jiangsu Foreign Trade Structure under the Perspective of Intra-Product Specialization,F752.8
  19. Sichuan Vocational and Technical College of Equipment Management Information System Design and Implementation,TP311.52
  20. Design and Implementation of Webgis-based Shule River Irrigation District Irrigation Management System,S274
  21. Structure Weight Reduction Research of Ship Unloader Based on Orthogonal Experiment Method,U653.928.1

CLC: > Industrial Technology > Radio electronics, telecommunications technology > Radio equipment,telecommunications equipment > Terminal equipment > Display device,the display > LCD monitors
© 2012 www.DissertationTopic.Net  Mobile