Dissertation > Excellent graduate degree dissertation topics show

Domestic EPC Joint Venture Mode General Contractor Risk Management Research

Author: ZhangKunSheng
Tutor: ZhaoDongMei
School: Southwest Jiaotong University
Course: Management Science and Engineering
Keywords: EPC mode Joint venture Risk Evaluation system Factor analysis Entropy weight method TOPSIS method
CLC: F284
Type: Master's thesis
Year: 2011
Downloads: 237
Quote: 0
Read: Download Dissertation

Abstract


The lump-sum contracting mode of EPC can make full use of the advantages of engineering, and achieve the targets to realize investmen economy, shorten project duration and improve quality level. With the introduction and prevalent appliance of this contracting mode, many uncertainties also come along especially in construction projects with joint venture as its general contractor. From this perspective, this paper has realistic meanings to figure out the critical risks existing in domestic construction projects conducted in the form of EPC by joint venture.1. After looking up a large amount of related literature, this paper carried out a systematical analysis and category of risks exerted on joint venture in projects with the mode of EPC. In addition, comprehensive communications with experts in this field also contributed to the identification and definition of critical risks. All of these made the completion of the investigation form possible, as well as the credibility and validity examination.2. After building the Likert scale of risks assumed by joint ventures in domestic construction projects with the mode of EPC, this paper finished the analysis of four major risks and35risk factors respectively with the methods of factor analysis.3. After comprehensive processing and analyzing the dates collected by the investigation forms, risk evaluation frames were constructed. Relative controlling methods to critical risks were also put forwarded by this paper.4. Case analysis on Project K applying EPC mode was carried out beginning with a brief introduction of this project. Based on the risk evaluation frames together with Entropy weight method and TOPSIS method, special analysis and appraisal on risks of Project K were schemed out in detail. The rank of major risks of Project K, precautions and solutions to these risks were also proposed.The research of this paper can offer some reference to the identification, evaluation, control of critical risks of construction projects applying the mode of EPC.

Related Dissertations

  1. Research and Analysis of Postcholecystectomy Diarrhoea (PCD) in Chronic Calculous Cholecystitis,R657.4
  2. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  3. Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
  4. Construction and improvement of basic education reform process evaluation platform,G521
  5. The Studies and Establishment of Ready-mixed Concrete Information-guided Price on the Basis of Risk Analysis,F407.92
  6. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  7. Financing Behaviors of Sina Microblogging in View of Risks,F49
  8. A Study on University Science and Technology Innovation Environment Evaluation,G644
  9. Study on the Results of Heilongjiang University’s Social Science Research Evaluation System,G644
  10. The Study on Risk Evaluation of BOT Projects in China University,G647
  11. Studieson Effects of Soybean Species on Yuba and Initial Establishment of Quality Evalution System for Yuba,TS214.2
  12. The Research on Evaluation Method of Highway Ecosystem Healthy,X826
  13. Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
  14. Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
  15. Assessment of Resistance Risk in Spodoptera Exigua (Hubner) and Spodoptera Litura (Lepidoptera: Noctuidae) to Chlorantraniliprole,S433
  16. Innovative biopharmaceutical companies a significant risk of dynamic analysis of continuous innovation and response measures,F273.1
  17. Open pit production accidents studied because of the risk management measures,TD771
  18. Research on Index System of Marketing Risks in Apparel Enterprises,F426.86
  19. Study on the Management Strategy of University’s Brand,G647
  20. A Smoothing Method for Solving Model under WCVarR,O224
  21. The Comparative Study of Competitive Advantage in the Self-Owned Clothing Brands of Beijing,F426.86

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure