Research of Non-Standard Automation Equipment Design’s Schedule Management
Author: HuangZanYang
Tutor: ZhangLianYing
School: Tianjin University
Course: Business Administration
Keywords: Project Schedule management Non-standard automation equipmentAOI Automatic Optic Inspection Equipment
CLC: F426
Type: Master's thesis
Year: 2012
Downloads: 74
Quote: 0
Read: Download Dissertation
Abstract
|
Schedule management is taking a scientific means defining project goals,schedule planning, then continue to grasp the real state of progress in the projectdevelopment process,and comparing the original plan, analysis of the deviation’scauses, Adjusted in time, to ensure timely completion of the project. Project schedulemanagement is always an important research subject in the field of engineeringconstruction, Many scholars have studied the progress management on Constructionproject, and Published a more mature theory of management process and controlmodel. But so far, there is little literature which research on project schedulemanagement about non-standard automation equipment design. Design ofNon-standard equipment industry started slowly in China. Design of Non-standardequipment’s management level is low, and lack of standard management systemwhich can be reference. In addition, the traditional concept that product design is thedesigner of the brain to stimulate innovative work, it is difficult to use generalproject management tools for schedule management.The article describes the basic theory of project schedule management. Analysisthe characteristics of design progress control about non-standard automationequipments. According to C company non-standard equipment design productionschedule management process, Then according to the actual project managementpractice it analysis of its management efficiency improvement and future direction.Through this research practice to provide the theory support for improving C innon-standard automation design progress control level. Conduce to company futurein non-standard automation development and the development of industry. Thencreate more and better design automation equipment, to liberate as boring repetitivework.
|
Related Dissertations
- Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
- Applied Research of Critical Chain Management in D Company’s Nuclear Power Equipments Manufacture Project Scheduling Management,F426.61;F224
- AFA3G manufacturing localization project schedule management research,F426.61
- Based on the Critical Chain Method of Jidong Oil Process Control System Engineering Project Schedule Management,TE35
- Research of Schedule Management System for Real Estate Program,F293.3
- Zhoucun the Schedule Management of the SC Road Landscape Reconstruction Project,U418.9;U415.2
- Research on Multi Project Schedule Management Based on Critical Chain,F426.471
- Dongfeng Fengshen H30 Cross models project scope and schedule management research,F426.471
- Heavy ship disposal of assets in the auction method of assessment,F724.59
- Nokia WCDMA project schedule management research in Jiangsu,F626
- Study on Full Cell Bus Project Management Base on Critical Chain,F426.61
- Progress Plan Management of Mill Project Based on Critical Chain Method,TG335
- A Study on Schedule Management of Offshore Oil Field Development Engineering Projects,F426.22
- Study on the Software Project Management of Tax Collecting System,F284
- Research on the Scheduling Management of the EPC Project Base on the Earned Value,F284
- Research of R&D Project Schedule Management Based on PDM for Equipment Manufacturing Enterprise,F426.4
- N City Telecom's broadband channel compliance rate to enhance the progress of the project management,F626
- CSS corporate systems integration project schedule management software system design,TP311.52
- Time schedule management in the broadcast monitoring platform construction in the applied research,G221
- Application and Study of Project Management for the Date Center Intergrated System Project of Shenzhen Airport,F562
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|