Dissertation > Excellent graduate degree dissertation topics show

Research on Route Schemes for the Circle Expressway (East Line) of Urumqi

Author: YangSiMing
Tutor: ChenChuanDe
School: Chang'an University
Course: Architecture and Civil Engineering
Keywords: Road Engineering Circle Expressway Route Scheme TOPSIS RSR
CLC: U412.366
Type: Master's thesis
Year: 2013
Downloads: 14
Quote: 0
Read: Download Dissertation

Abstract


With the further progress of urbanization, many cities in our country are planning andbuilding Cycle Expressway. The comprehensive comparison of the highway route planning isthe most important issue that need to be solved before construction,its science and rationalityare directly related to the project if it can meet the country’s economic construction needs.This article draws conclusions and gives a simple opening of the subject for discussionfromthe investigationof Cycle Expressway (East Line) in Urumqi and gives a certainsignificanceabout how to choose Cycle Expressway route program.Firstly, it analyzes the elements of the corridor,gives the principle of identifying andselecting corridor on the base of research on corridor identification and analysis. Draw theconclusions of steps, methods, characteristic about corridor choosing. And choose the route ofUrumqi Cycle Expressway Corridor (East Line).Secondly, on the base of the motor vehicle OD survey, it analysisthe traffic volume andtraffic characteristics. Giving the traffic generation forecast on the base of the analysis oftraffic characteristics, combined with the socio-economic trends, characteristics, as well as therelationship between socio-economic and transportation, and BP neural network, four-stepmethod. Do traffic distribution forecast combined with the regional road network size,characteristics. Do traffic assignment forecast combined with the space layout structure of theregional road network, road network characteristics, route selection features.Then, it demonstratesthe technical standard such as design speed and number of lanes,combined with the functions, status and terrain conditions of the regional road network andtraffic forecast results,on the basis of analyzing the design capacity and service levels.Ultimately, it selects technical standards reasonably. It is demonstrated that Urumqi CycleExpressway (East Line) is a six-lane expressway all the way whichthe design speed of100km/h.Once again, summarizing and expounding the principles and steps aboutsettinghighway start and end points, and focuses on the process of Urumqi Cycle Expressway (EastLine).Compared by analysis and demonstration, the start point of Urumqi Cycle Expressway(East Line) is Oasis Fort Interchange and the end point is Wulabo West Interchange.Finally, it proposes evaluation method based on TOPSIS-RSR route program, buildsup amathematical model of the highway route program evaluation. And it offers a comprehensiveevaluation of Urumqi Cycle Expressway (East Line) route options, compares the advantagesand disadvantages of each program fully, and selects the optimal route program.

Related Dissertations

  1. Little City with the ability to study sustainable economic development,F127
  2. Research on Supplier-Selection Based on Strategic Sourcing,F426.31
  3. Steady-State Optimization of Grinding Process Based on NSGA Ⅱ Algorithm,TD921.4
  4. Power Quality Research of Photovoltaic Power System in Substation,TM615
  5. The Rearch on the Rorest Ecosystem Construction Construction Techniques Around the City of Nanning,S731.2
  6. Experimental Research on Rubber Modified Concrete Pavement,U414
  7. Public Hospital Performance Evaluation Method and Application in the 13 Hospitals,R197.3
  8. Based on AHP-TOPSIS subway station construction scheme comparison study,U231.4
  9. Liaoning Province port logistics industry cluster Competitiveness,F259.27
  10. Modular Design and Scheme Solving for a Type of High-end CNC Machining Center and Their Application,TG659
  11. Study on Comprehensive Evaluation of Highway Route Scheme and Examples Analysis,U412.366
  12. Construction Cost Management of a Road Engineering in Baoji,F285
  13. Color Transfer Algorithm in Non-photorealistic Rendering,TP391.41
  14. Research and Implementation of Key Technology on Real-time Database System Called Vegebam2.0,TP311.13
  15. Research on Financing Risk Allocation of PPP Model in Infrastructure Projects,F283
  16. Study of Distribution Routing Problem Based on Multiple Objective Genetic Algorithm,TB114.1
  17. Research on Supplier Choice of Fumian Company,F274;F426.8
  18. Analysis and Evaluation the Hunan Public Scientific Literacy’s Affecting Factors,G322
  19. Study on the Performance Evaluation System and Its Application for State-Owned Enterprises,F276.1
  20. Research of Semi-rigid Base with Asphalt Pavement on Fatigue and Damage Properties,O346.2
  21. Study on Multiple Determining Weights Optimal Models Based on Entropy Theory and Cases Analysis,O236

CLC: > Transportation > Road transport > Road works > Planning, surveying and design > Circuit design > Road and its design > Highway