Study on the Water Hammer Prevention of Long-Distance and Multiple Branches,with Gravity Flow,Water Supply System

Author: MaLanLan
Tutor: YangYuSi
School: Chang'an University
Course: Municipal Engineering
Keywords: long-distance and multiple branches gravity flow water hammer tubebursting exhaust valves pressure regulating tower
CLC: TV67
Type: Master's thesis
Year: 2013
Downloads: 6
Quote: 0
Read: Download Dissertation

Abstract


With the faster and faster steps of the growing up of the cities and the improving ofpeople’s living level day by day, the water demand of various trades and occupations alsocontinually grows. But, the water resources distribution is also non-uniform all parts of thecountry, therefore, long distance and large-scale water distribution projects are also gettingmore and more, such as Xian Heihe water transportation project, Transport Water fromTianjin to Luanhe, Transport Water from South to North. But the tube explosion problem ofwater distribution project is also following. Because of the inconvenience and the greatdamage causing by the tube explosion problem of water distribution project, theanti-explosion technology research of long-distance and multiple branches water supplysystem, with gravity flow, water supply system is an important problem in safe operation ofpipelines. The technical personnels of the engineering also consider that it should beresearched in depth.In this paper, on the basic of the studies and development and the cause, classificationof the water hammer, Various flow patterns in the water pipeline are detailed to be analyzed;Calculating basic principle and methods of the water hammer prevention are to present;Giving the Boundary Conditions of many facilities; Making use of the calculator to carry onto imitate the calculation, with the Microsoft Visual C++being the developing tool. Simulatethe water hammer protection of the long-distance and multiple branches water supply system,with gravity flow, combined with the engineering example and the pipeline model.Analysis the calculation and compare the result for the water hammer protection of thelong-distance and multiple branches water supply system, with gravity flow, combining withthe Jingkui water supply project and Langzhuo water supply project. Research the changes ofthe pressure through closing the valve at the end of the main pipe and the branches. Combinedwith the exhaust problems of the pipeline, the measures of closing the valves in two stagesand the method of installing pressure regulating towers are put forward. The methods andadvices for preventing and reducing the tube explosion are also put forward.The result of this paper is not only favorite to Xinjiang Jingkui water diversion projectand Langzhuo water supply engineering pipeline safety operation management, but also valueto water hammer protection theory and method on the water supply system of all types.

Related Dissertations

  1. Water in oil emulsion of water hit the harmonic the demulsification dynamics analysis and its mechanism,X703
  2. Oil -in-water type emulsified oil water hammer harmonic LabVIEW Simulation and Experimental Research demulsification,X703
  3. The Application Research of Surgepre-Protection & ESD System in Oil Pipeline,TE973
  4. Study of the Rheological Properties of Tailings Backfilling Slurry and the Transport Properties of High-density Backfilling Slurry,TD926.4
  5. Research on Continel Gravity Flow Deposits in No.1 Member and No.2 Member of Nenjiang Formation of Central Depression in the North Songliao Basin,P618.13
  6. The Study on Numerical Simulation of Water Hammer in Long Distance Water Gravitation Transportation Project,TV135
  7. The Alteration and Optimization of Cemented Whole Tailings Gravity Transport Backfilling System,TD853.34
  8. Study on the Hydraulic Transients in Tree Water Supply Pipe,TU991.39
  9. Research on Sedimentary Facies and Sedimentary Evolution of Cambrian in Zhuozi Mountain Region,P618.13
  10. Research in Characteristic of Deep Lacustrine Sediment and Tuff Deposits of Yanchang Formation, upper Triassic in Ordos Basin,P618.13
  11. Study on the Box-type Two-way Surge Tower’ Effection in Prevention Hammer of Long Distance Water Gravitational Transportation Pipeline System,TU991.39
  12. Study on Water Hammer Protection using Box Type Two-way Surge Tank in Long Distance Water Pipeline with High-lift and Multi-fluctuation,TU991.39
  13. The Glutenite Bodies Depositional Stage Fine Division of the upper Fourth Member of the Sha He Jie Sand Formation in Yan Jia-Yong an Zone,P512.2
  14. Long gravity flow aqueduct system of protection against water hammer,TU991.39
  15. Experimental Study on Water Hammer Protection Using Box Type Two-way Surge Tank in Long Distance Water Pipeline,TV134
  16. The Reaserch on the Protection of Water Hammer in Large-scale Regional, Pressure Flow and Long Distance Water Supply System,TU991.39
  17. Study on Calculation of Water Hammer Protection of Long Distance and Large-scale Regional Water Gravitational Transportation Pipeline System,TU991.39
  18. Study on the Way to Waterhammer Protection in Long Distance and Heavy Calibre of Flow Flat Water Supply Pipe,TU991.39
  19. Simulation of the Interface Movement and Pollutant Transport of Multiphase Flow by VOF Method,X50
  20. The Monitoring and Control System of YinZhuJiXing Water Works,TP277
  21. Pipeline water hammer analysis,TE973

CLC: > Industrial Technology > Hydraulic Engineering > Water control,hydraulic structures > Water, water diversion project
© 2012 www.DissertationTopic.Net  Mobile