Power Transformer Partial Discharge of Handover Test Andanalysis of Abnormal

Author: KongZuo
Tutor: ZhaoTong
School: Shandong University
Course: Electrical Engineering
Keywords: partial discharges power transformer test methods Field Test
CLC: TM855
Type: Master's thesis
Year: 2013
Downloads: 50
Quote: 0
Read: Download Dissertation

Abstract


In recent years, with China’s rapid economic growth, the size of power grid construction in the rapid expansion. Demonstration project of the first domestic1000kV Jindongnan Nanyang-Jingmen UHV AC test has been successfully tested successfully, and put into commercial operation. With the transmission line voltage long distance increasing, put forward higher requirements of safety, reliable operation of power system. Power transformer is the important equipment in power system, its security and stability is directly affects the safe and stable operation of power system. Insulation of power transformer’s good guarantee power system safe,reliable operation of the decisive factors.Throughyearsof statisticaldata analysis, transformer for insulationdamage accidents accounte d for the total number of accidents from70to80%. There is a large part of the transformer in the factory or in the course of transportation insulation is flawed, in the process of operation, the insulation defect deterioration caused by the operation fault. Therefore, it is necessary to transfer test of power transformer. Partial discharge test of power transformer is a kind of non destructive testing, it can reflect thetransformers in the electric field, the local insulation breakdown, region specific changes in the electric field. Partial discharge test is very sensitive,can quickly test the defects of endangering the safety of the transformer insulation inner defects or transportation, installation, to prevent powerequipment accidents, ensure the stable operation of power system. The state also partial discharge test of transformer connection has detailed rules, the partial discharge test column must be detected at72.5kV and above voltage transformer are transported to the site of the project.After introducing the basic test of transformer partial discharge, combining theory with practice, from the people, machine, material, method, five factors are described in detail. Not only describes the test basis,preparation work, test equipment and operational resources, test process,test content, test steps each content, combined with the chart lists the steps of the experiment and standard test. Analysis of the interference field experiments, including the appropriate measures to prevent interferenceand its achievements.Select Qingdao500kV Huangdaosubstation, Huafeng220kV substation main transformer partial discharge test. As an application example, the transformer according to different transformertype, type,different voltageand differentmanufacturers, calculation, measu rementparameters on the measurement of partial discharge fault analysis steps,such as a full range are discussed in detail. Especially the failure analysis,is the practical problem of the construction unit of high voltage test personnel encountered, there is some reference value.

Related Dissertations

  1. The Effects of EGCG on Hippocampal Learning and Memory Defect Caused by Lead or Depression,R285.5
  2. Research on Neural Network Based Power Transformer Fault Forecast Model,TP183
  3. Power Transformer Test and Control System for Research and Implementation,TM406
  4. Time-varying Outage Model and Fault Diagnosis of Oil Immersed Transformers Based on DGA,TM411
  5. Investigation on Application of Frequency Conversion Power Supply in Partial Discharge Measurement of Power Transformers,TM855
  6. Study on the Axial Bearing Behaviors of Squeezed Branch Pile,TU473.1
  7. Highway tunnel lining structure with live fire testing of fire resistance,U451
  8. Study on Calibration Method of Gyrotheodolite,TH761.1
  9. Effects of Stress on the Behavior and Learning of the Rat Offsprings,R714.2
  10. Investigation on the Optimization Opreation and the Cold Aerodynamic Test for 2150t/h Supercritical Boiler,TK229.2
  11. Study on the Design and Field Testof Integra Pile-Plank Overall Structurein Beijing-Shanghai High-Speed Railway,U213.1
  12. TD-SCDMA Network Construction Plan of Shuozhou Mobile,TN929.533
  13. Noise Prediction and Analysis of Hydraulic Hoist Chamber Based on the Statistical Energy Analysis,TB535
  14. DSP-based variable voltage variable frequency power supply of,TN86
  15. Study on the Blasting Vibration Control Technology of Neighborhood Highway Tunnel,U455.6
  16. Research on Lance Nozzle Optimization of 120t Combined Blown Converter at Tonghua Steel Plant,TF748.3
  17. GPRS-Based Fault Automatically Detect and Meter Recording Communication System of Transformer Adaptable to Low-Voltage Distribution Networks,TM421
  18. Analyse Mechanism of Pressure-type Anchorage System and Study Application of Engineering,TU476
  19. The Research of Automatic Validation Algorithm for Security Protocols Based on Formal Methods,TP393.08
  20. Tests and Researches of Tire Pressure Monitoring Systems for Motor Vehicles,U463.341
  21. Research and Development of a Test System for Accelerometer,TH824.4

CLC: > Industrial Technology > Electrotechnical > High Voltage Engineering > High - voltage insulation technology > Insulation test and inspection
© 2012 www.DissertationTopic.Net  Mobile