Dissertation > Excellent graduate degree dissertation topics show
S Institute for Control of equipment production project progress
Author: LiuQiang
Tutor: LeiMing;HuangYong
School: University of Electronic Science and Technology
Course: Project Management
Keywords: arming manufacture program management program schedule schedule control
CLC: F426.4
Type: Master's thesis
Year: 2011
Downloads: 76
Quote: 1
Read: Download Dissertation
Abstract
|
The arming manufacture has the features of large investment, high independence, complicated program structure and production technologies, a throng of linkman, long cycle of manufacture, etc. The arming manufacture program composes commonly of multi-project and it is common that they function at one time. Therefore, the project management under the condition of multi-project has to face the schedule maladjustment due to the conflict between financing allocation and the demands, multi-layer roles of the team-members and overload works.The management problem of S institute over the arming manufacture is also the core problem that puzzles the majority arming R& D and manufacture units of our country for a long time. With the flourish development of the arming manufacture industry, a large number of arming manufacture programs of R&D enterprises or institutes start in succession. However, when facing the situation, the traditional schedule control technologies and methods are lack of pertinency and maneuverability. So, it is with great significant to investigate the schedule control for such program to meet the requirements from the users and markets, arrange the reasonable and tighten timetable, improve the quality control level, control the investment and push rapidly market occupation.The article reviewed the program management and program schedule control theories. It also analyzed the program features, the impact causes of schedule control and the current problems of the present arming manufacture programs of S institute. According to the present situation of S institute, it built an arming manufacture program schedule control matrix through the program schedule management methods, meanwhile; it gave a conclusion through the analysis to the program organization, communication, coordination and inspiritment of the arming manufacture, which to ensure the operation of the matrix.The purpose of the research is to do some rationed and qualitative analysis from the basic concept of project schedule control, major tasks, impact causes, control principle, control methods, control methods. The article adopts literature research and investigation research to improve its accuracy.
|
Related Dissertations
- Study on Schedule Plan and Control of Smart Card Appllying System for HNU,TP399-C1
- Heilongjiang Unicom WCDMA network project schedule management research,F626
- Research on Schedule Plan and Control of Shougang Cold Rolling Project,F426.31
- Application of Program Management in Regional Investment Attraction,F127
- SSX Expressway Weight Charges of Project Progress Management Research,F542
- Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
- Progress Control Research of GS Building,TU722
- Intelligent Optimization Control in Furnace Production Process,TG307
- Yuedian Practical Operation Base Project Cost and Schedule Control Model Construction and Use of,F426.61
- Design of Network Video Colection System Oriented for Program Management,TP391.41
- Emei Film Channel television program management platform,TP311.52
- Linear Planning-based Visible Scheduling Control System of Subway,U231.3
- Project Management Research on CE Certification of Construction Products,F203
- Construction of the Dam Safety Monitoring Control Management,F224;F293.3
- Zhoucun the Schedule Management of the SC Road Landscape Reconstruction Project,U418.9;U415.2
- Study on Scheduling and Schedule Control for Store Electric Turnkey Project,TU722
- State Road 112, Five-line High-speed Adjustment of the Contract on the Project Schedule and Control,F542
- Real estate development project schedule management and performance assessment study,F293.3
- Employee Performance Appraisal System of Real Estate Company Based on Project Management,F293.33
- Study on Productive Plan Management of the ERP Based on ZHSD Corporation,TP315
- Communications professional services in project management in the application and evaluation,F626
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|